ALORO MINING CORP. announced that it has mobilized a D8 bulldozer to the Los Venados property for road construction and building of drill pads. The bulldozer was expedited from Hermosillo, Sonora to Mulatos, Sonora. On Saturday the bulldozer will start to construct the permitted 3.63 km access road to the permitted 12 drill sites in order to build the drill pads. The road will allow to use a Reverse Circulation (RC) Drill Rig where it has been proven to get better recovery in the area. The road construction to the drill sites becomes a valuable exploration program in itself as it will open up new exposures for sampling in mineralized areas and structure that were previously undercover. The new road cut and drill pads will be sampled and geologically mapped.