Wesdome Gold Mines Ltd. announced additional high grade results from the ongoing underground exploration drilling of the Kiena Deep A Zone at its 100% owned Kiena Mine Complex, in Val d'Or, Quebec. Since the October 12 cut off date for drill data used in the recent resource estimate released on December 12, 2018, exploration and definition drilling has been ongoing with 5 drills at the Kiena Deep A Zone. Since this time, approximately 4,200 metres in 16 holes have been completed. The ongoing drilling is utilizing the newly developed ramp and crosscut extensions completed in November, which enhance drill angles and drill efficiencies. These platforms now allow diamond drilling to be able to intersect the up and down plunge extension of the Kiena Deep A Zone consistently. The ongoing definition/infill drilling has continued to confirm the overall continuity of the Kiena Deep A Zone and improve the understanding and confidence in the controls on gold mineralization. Drilling to date has identified a well-defined, moderate plunge of approximately 45 degrees to the SE to the gold mineralization that occurs predominantly along the basalt - chlorite- carbonate schist boundary. Ongoing drilling has continued to expand the Kiena Deep A Zone up and down plunge, in excess of 50 additional metres in each direction, and has also provided additional confidence in the understanding of the up and down plunge potential and focus for drilling. Four drills are in operation on the 1050 m level exploration ramp completing the infill and extension drilling, and a 5th drill is now drilling at the 670 m elevation to test the interpreted up plunge extension of the A Zone towards the VC zone area. This up plunge extension is understood to be in excess of 425 metres and would be in addition to the 500 metres of plunge length already defined by drilling (Figure 1A and 1B and 2). This has the potential to significantly add to the resource base, and could be a vital enhancement in any restart scenario. Hole 6384A: 33.7 g/t over 30.6 m core length (28.4 g/t Au cut, 15.0 m true width), Hole 6378: 36.5 g/t Au over 7.0 m core length (18.4 g/t Au cut, 5.0 m true width), Hole 6392: 153.4 g/t Au over 1.4 m core length (35.4 g/t Au cut, 1.3 m true width), Hole 6402: 51.9 g/t Au over 7.6 m core length (17.9 g/t Au cut, 7.6 m true width), Hole 6409: 39.8 g/t Au over 4.7 m core length (20.0 g/t Au cut, 3.6 m true width). All assays cut to 90.0 g/t Au. True widths are estimated.