News Release –
Economics
Total Capital Required over 3 years – |
Equipment delivery and installation period (including mine permitting) – 24 months |
Payback period after start of production – 11 Months |
Operating Gross Margins average 75% over the Project |
Base Case | Pre-Tax | After-Tax |
Net Present Value - 8% discount rate | ||
Total Project Cash Flow (10 year cumulative) |
The base case economics for the Project, indicates a pre-tax net present value (“NPV”) of
Based on current shares issued and outstanding, the NPV after tax =
Processing products include the following:
Smooth X
Barium Sulfate 98% HDX
Barium Sulfate 96% LDX
MultiXThick
MultiXThin
Bulk Product
BaSODrill Product
Current pricingof97.5%BaSO4available from
Resource Model
For the mineral resource estimation, SGS relied upon data that Voyageur supplied in pdf, xlsx and other formats. The final database contains 57 drillholes and 3 channels totalling 3,106.12 m. The length of the channels ranges from 2.5 to 8.4 m and the drillholes range from 18.29 to 122.53 m in length. There are 169 assays varying from 0.15 to 18.3 m in length and from 0.22 to 99.09 % BaSO4, and there are 100 lithology intervals.
Voyageur provided SGS with a three-dimensional lidar topography. The verification of the surface shows a great accuracy. The site visit indicated that the overburden was estimated to be 2m deep in most places. Therefore, a depth of 2m vertical was applied for the entire project for the overburden.
The 2003-2017 drilling was used to make a 3-dimensional mineralisation model. A total of 3 volumes were modelled and named A, B1 and B2.
A block model was then created and estimated by Inverse Distance squared (IDS) using calculated composites of about 2.5 m but with the avoidance of remainders by slight adjustments in the composite lengths. Capping was found to affect minimally the resource results. Nevertheless, samples of more than 5 m in length got their grades reduced by 10% to reduce the risk related to these long intervals. The global impact is a reduction of the grade by about 5%. The block size used was 5 x 5 x 5m. Block fractions were used so the blocks have a “percent block” variable between 0 and 1 to account for incomplete blocks partly inside the mineralized volumes. Similar estimation parameters were used for the 3 estimation passes: minimum number of samples: 3, maximum number of samples: 5, maximum number of samples per drillhole: 2. There were 3 successive estimation passes with “variable orientation” search ellipsoids: pass 1 with a search ellipsoid of 20 x 20 x 5m, pass 2 with a search ellipsoid of 40 x 40 x 10m; and pass 3 with a search ellipsoid of 80 x 80 x 30m. Hard boundaries were used for all 3 solids.
Because of the small deposit and the high value of the Barite, the 2 pits were not optimized using a pit optimizer. The pit designs were created around the mineral volumes. The following assumptions were used to estimate a cut-off grade of 10% BaSO4.
The specific gravity used for the mineralized material is based on the BaSO4grade using the following formula: SG = 2.828 + 0.0000009404*(BaSO4)3 - 0.000030963*(BaSO4)2 + 0.010623107*BaSO4that fits
very well with the 87 measurements from 2017. The formula also fits reasonably well with the 82 measurements from 2003 and 2005.
The resources are shown in the table below:
Click Image To View Full Size
(1) Effective date for resources is
(2) The independent QP for this resources estimate is
(3) The base case is reported at a cut-off grade of 10% BaSO4.
(4) Open pit mineral resources are reported at a base case cut-off grade of 10% BaSO4within a conceptual pit shell. Cut-off grades are based on a barite price, barite mining and processing recovery and mining and processing cost.
(5) The resources are presented in-situ and without dilution.
(6) Block fraction was applied to the mineral resources.
(7) Mineral resources that are not mineral reserves do not have demonstrated economic viability.The quantity and grade of reported Inferred Resources in this Mineral Resource Estimate are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as Indicated or Measured. However, based on the current knowledge of the deposits, it is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
(8) This Resource Estimate has been prepared in accordance with CIM definition (2014).
(9) The density used for each block is based on grade and the following formula:
2.828+(0.0000009404*(BaSO4)3) - (0.000030963*(BaSO4)2) + (0.010623107* BaSO4)
(10) A variable BaSO4capping grade was used by removing 10% of the grade on assay with lengths >5 m and resulting in an overall reduction of 5% of the barite content.
(11) Total may not add due to rounding.
Quarry
The Project has a very small environmental footprint at the quarry site. Management has moved forward to create a project that limits environmental issues. Voyageur has eliminated tailing ponds, reduced water consumption, designed a quarry and concentrate processing site that uses minimal land and low land disturbance to the area. Mining will be seasonal, and work will continue to expand the resource. The PEA economics are based on quarry operations on the B zone. Voyageur has resource below the B zone at the A zone. Voyageur will be expanding its exploration program after positive cash flow to continue to expand the Project.
Capital & Operating Costs
Capital and operating costs for both the mine and processing facilities were developed based on first principal calculations, factored estimates, project benchmarking, vendor quotes and conceptual scheduled production/equipment hours where available. The qualified persons have reviewed these costs andconcluded they are reasonable for inclusion in the PEA. Capital and operating costs are estimated within +/- 40% at a Preliminary Economic Assessment level of accuracy. Process capital costs include a 15% contingency, while mining costs are based on current rental quotes, contractor rates and first principal calculations.
Mining and infrastructure costs, as well as primary processing of the BaSO4product was conducted by SGS, while capital and operating costs for the pharmaceutical products was provided by
A summary of Mine and Process capital costs are presented in the Table below.
Description | Capital |
Mining and On-Site Processing | 3.82M |
Process plant | 13.18M |
Process Plant Infrastructure | 5.36M |
Bottling Facility | 2.96M |
Subtotal Direct Costs | 25.3M |
Indirects | 1.85M |
Engineering and project management | 3.70M |
Provisions and Owners’ costs | 1.31M |
Contingency | 4.26M |
Subtotal Indirect Costs | 11.2M |
36.4M |
Sensitivities
Figures show the results for the base case for post-tax NPVs.
Click Image To View Full Size
A sensitivity analysis was conducted on capital costs, operating costs and revenue in 10% increments from 60% of base values to 140% of base values (+/- 40%). Results indicate that any scenario within this large range still produce strong NPVs.
Voyageur Near Term Strategy
Voyageur is currently using third party manufacturing and mineral supplies to develop its first products for market. Voyageur has
Produce products using third parties
Build critical mineral active pharmaceutical ingredient (“API”) good manufacturing practice (“GMP”) processing plant and barium Quarry
Fully integrate the barium contrast market and supplement revenue with high purity industrial barium sales
Produce iodine products utilising third parties
Produce iodine products from brine waters with fully integrated processing plant from the well head to the bottle
Voyageur is continuing to advance its full integration of the radiology barium and iodine drug and device market. Management believes Voyageur’sFrom The Earth To Bottlestrategy has sound economics to create high growth and profitability in the near future.
About Voyageur
Voyageur is a Canadian public company listed on the TSXV under the trading symbol VM. Voyageur is focused on the development of barite and iodine Active Pharmaceutical Ingredients (“API”) and high-performance cost-effective imaging contrast agents for the medical radiology marketplace. Voyageur’s goal is to initially generate positive cash flow from operations using third party GMP pharmaceutical manufacturers in
Voyageur is moving forward with its business plan of becoming the only fully integrated company in the radiology medical field, by controlling all primary input costs under the motto of: "From the Earth to the Bottle".
Independent Qualified Persons
The resource estimate was prepared by
Both
For Further Media Information or to set up an interview, please contact:
President & CEO
Ebrent@vpharma.ca
www.voyageurpharmaceuticals.ca
CFO
T 403.818.6086
E ronl@vpharma.ca
Neither the
Cautionary Statement Regarding “Forward-Looking” Information
This news release may contain certain forward-looking information and statements, including without limitation, statements pertaining to: the estimates set out in the PEA including total capital required, capital and operating costs, equipment delivery and installation period, payback period, operating gross margins, net present value, cash flow, and the resource estimation and grade of the barite; Voyageur generating revenue in 2022; the timing and success of penetrating the US and other markets; the timing and success of the Company's products meeting various regulatory standards; and the Company's long term plans, including with respect to becoming 100% self-sufficient with all manufacturing. All statements included herein, other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties. There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. A description of assumptions used to develop such forward-looking information and a description of risk factors that may cause actual results to differ materially from forward-looking information can be found in the Company's disclosure documents on the SEDAR website at www.sedar.com. Voyageur does not undertake to update any forward-looking information except in accordance with applicable securities laws.
Copyright (c) 2022 TheNewswire - All rights reserved.
Copyright (c) 2022 TheNewswire - All rights reserved., source