Vallourec: major order for the Gulf of Mexico
The orders are for the delivery of 25,000 tons of line pipe for the Salamanca deepwater development project, located off the US Gulf Coast.
The material ordered from Vallourec includes 52 km of X70 grade heavy gauge line pipe and 111 km of X65 grade pipe required for risers and flowlines for oil and gas export lines. The tubes will be manufactured and machined at two sites in Minas Geiras (Brazil).
These major orders mark the strengthening of Vallourec's position in the strategic Gulf of Mexico market and demonstrate the competitiveness of our Brazilian base", commented Philippe Guillemot, Chairman and CEO of Vallourec.
Copyright (c) 2023 CercleFinance.com. All rights reserved.
Go to the original article.
Contact us to request a correction