Traction Uranium Corp. announce receipt of access and permission from the Saskatchewan Ministry of Highways allowing the Company to utilize a lease located near the Key Lake South Project (KLS) to use as a temporary drilling camp beginning February 1, 2023 to July 3, 2024. Phase 1 Diamond Drilling is planned with 2,000 metres, targeting areas with extreme surface uranium anomalies including the “black soil” anomaly, the “radioactive swamp” and the “Athabasca Sandstone” mapped in 1973 (AR 74H04-0013).

Most of the drill targets are situated at the edge of the broad gravity-lows identified in the ground gravity survey of 2022.