Theta Gold Mines Limited provided corporate and operations update. The company announced that the Theta Starter Open-pits permitting amendment for MR83 is progressing through the normal government departments and is currently being reviewed by the Department of Mineral Resources and Energy in consultation with other stakeholders. The Company will update shareholders as the permitting advances as and when information becomes available to the company. The Pre-Feasibility Study on the potential underground mining operations is progressing well with many components of work already completed. The PFS, to be completed by first quarter of 2021, will produce the maiden underground mining reserve for the underground mines predominantly on granted Mining Right 83. The first stage of the PFS is to match modern mechanized mining methods to the narrow, flat dipping reef systems. Mechanized Long Hole Stoping has been identified as the likely mining method which offers many advantageous. The Long Hole Mining Method allows for a reduced safety and health risk, as well as improved productivity. The major advantage is the improvement in grade due to better control of dilution, as only the channel width of the ore body is mined. This reduces ore transport costs, lengthens the tailings dam life and improves cost efficiency per ounce. Met 63 is supervising detailed metallurgical test work at Dynamic Engineering's test plant for the underground ore feed. Scope of test work includes analysing:- crushing circuit, Dense Media Separation, milling curves, carbon flotation, reagent selection, and build flowsheet for final design of gold plant.