Alloy Resources Limited reported the final results from the major program of air core exploration drilling completed at the Horse Well Gold Project in the North Eastern Goldfields of Western Australia in late 2016. Joint Venture Manager Doray Minerals Limited has advised that results from the final 390 holes totaling 23,637 metres of a major aircore drilling programme have been received, compiled and interpreted. The company can report on this second phase of the drilling which saw holes allocated to 800 metre x 160 metre regional first pass drilling of an untested 7.5kilometre section of the greenstone belt south of the Django prospect. The drilling has outlined three large anomalous gold trends extending south from the Django and Crack of Dawn South prospects; 7 kilometre long eastern anomaly; 6 kilometre long central anomaly; 3 kilometre long western anomaly. The eastern and central anomalies are associated with a newly defined extensive granite intrusive that appears to intrude the Celia Shear at the contact between western sedimentary units and eastern mafic units. Better results were: HWAC874, 20m @ 0.27 g/t Au from 56 mdh; HWAC915, 8m @ 0.84 g/t Au from 64 mdh; HWAC995, 4m @ 1.49 g/t Au from 72 mdh; HWAC1039, 8m @ 0.35 g/t Au from 56 mdh; HWAC1053, 4m @ 0.84 g/t Au from 48 mdh; HWAC1144, 28m @ 0.33 g/t Au from 52 mdh; HWAC1153, 4m @ 0.90 g/t Au from 76 mdh.