Solar Alliance Energy Inc. announce it has signed a contract with Louisville Gas and Electric Company and Kentucky Utilities Company. On November 9th, Solar Alliance announced it had signed a contract for a 500-kW system that included an option for LG&E and KU to select Solar Alliance to build an additional 500-kW system at the same location. LG&E and KU exercised that option, and Solar Alliance will now build a combined 1-megawatt (“MW”) project for the customer. The two phases will be built simultaneously, and construction will commence in the spring of this year. The two projects represent sections three and four of LG&E and KU’s Solar Share Program, a cost-effective option available to the utilities’ residential, business and industrial customers who want to support solar energy for as little as 20 cents per day. A total of eight 500-kilowatt Solar Share sections are planned for the Simpsonville facility, for a total of four megawatts.