Skeena Resources Limited reported additional diamond drill core results from the Phase 2 campaign of definition and exploration drilling at the Eskay Creek Project ("Eskay Creek" or the "Project") located in the Golden Triangle of British Columbia. The Phase 2 infill program focused upon resource category conversions for the Pre-Feasibility Study ("PFS") on open-pit constrained resources, is now complete. Six drill rigs are currently active at the Project finalizing a 5,000 m near- mine exploration program. Intercepts from the completed Phase 2 program continue to demonstrate the tenor, continuity, and thickness of the pit-constrained resources in the 21C Zone at Eskay Creek. This is highlighted by an intercept of 5.38 g/t Au, 22 g/t Ag (5.67 g/t AuEq) over 71.85 m (SK-20-626) which confirms the continuity and grade modelled in this portion of the 21C Zone, and is corroborated by 8.82 g/t Au, 25 g/t Ag (9.15 g/t AuEq) over 25.50 m in a flanking drill hole (SK-20-627). Mineralization in this area is gold-dominant and is hosted within the footwall rhyolite with only minor grade contributions from silver. These drill holes are situated 75 m north of previously reported 7.17 g/t Au, 146 g/t Ag (9.12 g/t AuEq) over 49.60 m (SK-20-579). The Phase 1 and 2 drilling campaigns have successfully confirmed the spatial continuity and tenor of the mineralization of the Inferred resources defined by the company's 2019 Mineral Resource Estimate (MRE). The incoming assay results from the Phase 2 infill drilling program continue to validate the predicted and modelled Inferred mineralization which was informed by widely spaced historical drill holes in the Skeena 2019 MRE.