Silver Falcon Mining, Inc. reported that the U.S. Bureau of Land Management (BLM) approved the Sinker Tunnel project site-plan which covers equipment usages, placement, etc. The security fencing which was necessary, for obvious reasons, has been completed. During exploratory drilling, the drill intercept cores will be logged and assayed by geologists, and this information will be put into a 3-D modeling program which helps determine the resource and reserve calculations of ore -bearing material within this portion of SFMI's claims. Reclamation of the pregnant tailings stored on site has begun in preparation to reprocess the 30,000 tons through the new floatation circuit.

This process is to reduce this tonnage to much higher content of Gold and Silver per ton.