San Gold Corporation announced preliminary results of operations at its Rice Lake Mining Complex in Manitoba, Canada for the third quarter ended September 30, 2013. The company produced 20,220 ounces of gold in the third quarter, bringing total production for the first nine months of the year to 60,100 ounces. The operation milled 175,311 tons in the quarter at an average daily throughput of 1,906 tons per day and mined 167,937 tons of ore at an average daily rate of 1,825 tons per day. Mill recovery was 93.3% and milled grade was 4.24 grams per tonne. The company ended the quarter with approximately 7,800 tons in surface stockpiles.

The company expects to achieve its production guidance and is tracking towards production of between 75,000 and 85,000 ounces of gold in 2013.