Sadbhav Engineering Limited informed that the Company has received Letter of Acceptance ('LOA') from Gujarat Metro Rail Corporation (GMRC) Limited for the Metro Rail Project for a contract value of INR 7,797.3 million. The construction of 11.6 K.M. Elevated Viaduct from Kadarsha Ni Nal to Dream City Dead End Including Ramp for Depot entry near Dream City and 10 Stations (Exel. E&M, Architectural Finishing and Roofing) for Surat Metro Rail Project Phase-1, Package-CS1 in the name of SEL-SPSCPL Joint Venture. Construction period of Metro Rail Project will be 30 months from date of issue of Letter of Acceptance.