Renforth Resources Inc. announced results for the first three holes drilled at Parbec in the December 2018 program, which includes 11.56 g/t Au over 1.1m in PAR-18-88 the first hole in that program. The December 2018 program was designed to test the presence of shallow mineralization with grade and continuity outside of a 50m buffer zone from the rail line, and to extend and increase the mineralized zones. Each of PAR-18-88, PAR-18-89 and PAR-18-90 successfully intersected mineralization as targeted, defining shallow mineralization and expected to result in positive impact to the resource at Parbec upon recalculation. Results are still pending for the other 4 holes in the December 2018 program, these will be released once available. PAR-18-88: This drill hole on line 4975E was designed to drill under PAR-17-69 and over PAR-18-84, effectively in between, designed to fill in the steeply vertical mineralized zone seen on that section. PAR-18-89: This hole, with the results noted above, was a successful infill drill hole, including mineralization in two zones intersected above a vertical depth of 90m, outside of the 50m setback from the rail line. This hole, on line 5000E, was an overcut of PAR-18-70, designed to expand the zones seen in the hole. PAR- 18-89 successfully did this, extending the mineralized zone up-dip on line 5000E as demonstrated in the assays noted above. Mineralization encountered was above a vertical depth of 75m, outside of the 50m setback from the rail line. PAR-18-90: This drill hole, also on line 4975E, now the deepest hole on that section line, is an undercut of PAR-18- 84, specifically targeting a deeper intersection of the interval in PAR-18-84 which assayed 4.66 g/t Au over 9.45m in that hole, which was successfully intersected in PAR-18-90 with 2.18 g/t Au over 7.4m, interpreted as a depth continuation of the PAR-18-84 zone. This intersection was also outside of the 50m buffer zone.