Rambler Metals & Mining PLC reported production results for the fourth quarter ended July 31, 2013. For the quarter, the company reported production of 5,244 tonnes of copper concentrate 1,297 ounces of gold and 9,873 ounces of silver. This represents a 15% increase in concentrate produced from the third quarter of 2013. Mill throughput through the copper concentrator during the fourth quarter totaled 47,027 tonnes with a copper recovery of 94%, 65% for gold and 73% for silver. Metal produced for 1,574 tonnes of copper, 1,297 ounces of gold and 9,873 ounces of silver, increased by 23%, 31% and 31% respectively over the third quarter of 2013. Head grades of copper was 4.05% and gold was 1.52 g/t, increased by 13% and 18% respectively over third quarter of 2013. Recoveries to concentrate for copper was 94%, Gold was 65% and silver was 73%, increased by 3%, 4% and 3% respectively over third quarter of 2013. Concentrate grade for copper was 30%, Gold was 7.7 g/t and silver was 58.6 g/t, increased by 7%, 15% and 14% respectively over third quarter of 2013.

The company announced that copper production for the fiscal year 2014 is forecast between 5,700 and 6,840 tonnes of metal with 4,500 to 5,500 ounces of gold and 32,000 to 39,000 ounces of silver.