TomaGold Corporation report that IAMGOLD Corporation (IAMGOLD) announced assay results from the 2019 winter drilling program completed at its Monster Lake joint venture project (IAMGOLD: 50%, TomaGold: 45%, Quinto Resources Inc.: 5%), located 50 kilometres southwest of Chibougamau, Quebec, Canada. IAMGOLD is reporting the final assay results from 16 drill holes, totaling 5,270 metres, completed as part of the 2019 exploration program. Annie Shear Zone system: Drill hole ML19-244: 0.8 metres grading 357 g/t gold; Drill hole ML19-248: 6.8 metres grading 3.85 g/t gold - Includes: 1.67 metres grading 6.43 g/t gold; and Drill hole ML19-249: 0.5 metres grading 133 g/t gold.

Big Mama Shear Zone area: Drill hole ML19-245: 13.0 metres grading 2.27 g/t gold - Includes: 1.39 metres grading 6.45 g/t gold; and Includes: 1.47 metres grading 7.65 g/t gold. The objective of the 2019 drilling program was to test priority areas along the strike of the main structural corridor, hosting the 325-Megane zone, for additional zones of mineralization with potential to increase total mineral resources on the property. Three main target areas were tested along the Monster Lake Mineralized Corridor and included: the southern extensions of the 325-Megane and Lower Shear zones; the general area of the intersection of the Main Shear zone and the Big Mama Shear zone to the northeast of the 325-Megane zone; and the Annie Shear zone system also to the northeast along strike of the 325-Megance zone.

All of the areas targeted in this program were best accessed during the winter when the ground is frozen. These results will be incorporated into the structural and deposit model and used to guide the next drilling programs. Ongoing field activities for the summer season includes geological, geochemical and structural studies to support exploration targeting.