Plateau Uranium Inc. announced outcrop sample results and continued strong drill results from the final two drill holes from Platform 1 at the Falchani discovery, located in the Chaccaconiza area of the company's Macusani Plateau Project in southeastern Peru. Falchani Discovery Drilling & Outcrop Highlights: Outcrop samples of Li-rich tuff returned up to 3,365 ppm Li (0.72% Li2O) ~500 m West of Platform 1, High-grade lithium-mineralization remains open at depth as none of the Platform 1 drill holes intersected the lower contact of the Li mineralized unit, Drilling continues with additional holes planned to expand the mineralized footprint of both lithium and uranium mineralization. PT-PCHAC01-TV Vertical Drill Hole; 132.5 m total length: Intersected 49.0 m averaging 338 ppm U3O8 from surface 0.0 to 49.0 m downhole with higher grade intersections closer to surface hosted in typical Macusani rhyolites, Intersected 45.7 m of 3,415 ppm Li (0.74% Li2O) from 86.8 to 132.5 m (End of Hole) in felsic ash fall tuffs, ending in these rocks/mineralization. PT-PCHAC01-TSW - 265° Az; -55° inclination; 82.5 m total length: Intersected only weak surface uranium mineralization over three narrow intervals - possibly marks the SW extent of the uranium deposit, Drill hole abandoned at 82.5 m due to rubbly ground conditions just as the hole encountered the upper contact of the transition into the Li-rich tuff unit. Basal 5.5 m averaged 813 ppm Li from 77.0 to 82.5 m.