Nxu, Inc. is under contract to purchase a parcel of land in Barstow, Calif., a key location in California's NEVI corridor 7. Barstow, situated where Interstate 15 and Interstate 40 intersect, is perfectly located in a major highway corridor, making it ideal for Nxu's pursuit of electrifying high-demand highway routes with reliable and consistent charging solutions. National Electric Vehicle Infrastructure (NEVI) corridor 7 is one of the six corridor groups included in round 1 of the California Energy Commission's NEVI Formula Program, which has announced the availability of up to $40,500,000 in grant funds for projects that will strategically deploy high-powered, direct-current fast charger electric vehicle charging infrastructure. NxuOne EV Charging Solutions enable powerful, standard-agnostic charging, giving all EV users exactly the power they need, when they need it.

EV drivers can expect a consistent, reliable charging experience with NxuOne EV Charged Solutions. Nxu previously announced Quartzsite, Ariz. as its first highway charging location and anticipates breaking ground in 2024.

Additional California sites under contract include Tehachapi and North Edwards. Businesses interested in securing their own NxuOne EV ChargING Solutions, whether to power their own EV fleets or to contribute to the much-needed EV charging infrastructure more and more consumers are demanding every day.