Miramar Resources Limited provided an update on exploration activities at its 80% owned Gidji JV Project ("Gidji" or the "Project") located 15km north of Kalgoorlie in the Eastern Goldfields region of Western Australia. The Company is pleased to advise the commencement of RC drilling at Marylebone. The aim of this campaign is to test beneath significant aircore results for the first time and to gather information about the local bedrock stratigraphy to enable comparison with the geology of the 4 million ounce Paddington gold deposit along strike to the north.

The Company is planning a substantial exploration programme at Gidji during 2022 including: RC bedrock testing of the Marylebone target - underway. Extending the detailed magnetic survey over the northern Boorara Shear Zone. Aircore drilling of various targets (Figure 1) including: Blackfriars (infill), Highway, Boorara North, Boorara South.

Refining "The Jog" target for RC and/or diamond drill testing.