Pilot Gold Inc. reported additional results from seven diamond core holes from its ongoing drilling of TV Tower's KCD target in northwestern Turkey. In particular, step-out drilling in the southeast portion of the KCD target returned significant intervals of moderate to high-grade gold in three holes. Southeast step-out drill highlights include: 2.33 g/t gold (Au) over 93.5 metres in KCD-75, including 17.4 g/t Au over 3.5 metres, 1.79 g/t Au over 78.6 metres in KCD-89, including 7.01 g/t Au over 6.0 metres, 1.94 g/t Au over 14.3 metres in KCD-73, and 1.12 g/t Au over 14.5 metres, and 1.29 g/t Au over 11.5 metres. Core holes KCD-73 and KCD-75 were fanned from a single drill pad located approximately 40 metres southeast of KCD-65 (2.79 g/t Au over 61.3 metres, including 8.64 g/t Au over 10.5 metres). The results further extend the strike extent of the gold zone at KCD to over 350 metres. An additional hole was drilled down-dip to the northeast of KCD-75, with results pending. KCD-89 tested the down-dip extension to the northeast of mineralization in KCD-65, from the same pad. Additional drilling will test for gold mineralization further down-dip to the northeast of this hole. High-grade infill drill highlights include: 2.11 g/t Au over 58.0 metres in KCD-90, including 11.6 g/t Au over 7.9 metres 3.47 g/t Au, 63.1 g/t silver (Ag), 1.01% Copper (Cu) over 23.9 metres in KCD-86; including 5.23 g/t Au, 103.8 g/t Ag, 1.74% Cu over 11.6 metres. Infill core holes KCD-86 and KCD-90 tested the area between recently reported KCD-79 (14.9 g/t Au over 14.1 metres) and KCD-50 (227 g/t Au over 12.0 metres) in the north-central portion of the gold mineralized zone and returned high-grade gold. Significantly, KCD-86 also intercepted high grades of silver and copper. The drill results form part of an aggressive exploration program consisting of 16,000 metres of diamond core drilling, property-wide airborne magnetic/EM geophysics and ongoing surface mapping and geochemical sampling. Approximately 13,304 metres in 66 holes at KCD have been completed since the program started in June 2012, with assays pending for 17 holes. Drilling in the near-term will continue to focus on infill and step-
out drilling in the KCD target area.

The company plans to undertake 25,000 to 30,000 metres drilling (total) at the KCD, Kayali and Sarp/Columbaz targets in 2013.