KBR, Inc. announced that its joint venture with SOCAR has been awarded two separate Front-End Engineering Design (FEED) contracts for a new Production, Drilling, Quarters (PDQ) platform – the Azeri Central East (ACE) platform – to be located in the Azeri-Chirag-Gunashli (ACG) field in the Azerbaijan sector of the Caspian Sea. The contracts, which were awarded by the Azerbaijan International Oil Company, cover the provision of FEED services for the new platform, along with associated brownfield tie-ins to other existing platforms in the ACG field, and a separate contract for the subsea services FEED.