As a result of the Montara shut-in and the performance of the wider production portfolio year-to-date, the Jadestone Energy plc now expects that 2022 production will average between 13,000 and 14,000 boe/d. This compares to the announcement on 20 June 2022, which signalled that 2022 production would likely be around 15,500 boe/d, being the lower end of the previous guidance range. The revised 2022 production guidance reflects the Company's assumption that production from its non-operated assets offshore Peninsular Malaysia will now remain shut in for the remainder of 2022, due to ongoing delays in reinstating operations.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
32 GBX | +0.31% |
|
+2.40% | -12.33% |
07-03 | EXECUTIVE CHANGES: Jadestone Energy's CFO Bert-Jaap Dijkstra to leave | AN |
07-03 | Jadestone Energy CFO to Step Down | MT |
![Consensus](/images/consensus_flch.gif)
EPS Revisions
1st Jan change | Capi. | |
---|---|---|
-12.33% | 221M | |
+3.47% | 284B | |
+78.08% | 147B | |
-3.31% | 132B | |
+13.05% | 76.68B | |
+3.87% | 71.8B | |
+2.08% | 54.79B | |
+1.71% | 45.11B | |
-7.47% | 37.47B | |
+31.13% | 36.3B |
- Stock Market
- Equities
- JSE Stock
- News Jadestone Energy plc
- Jadestone Energy plc Revises Production Guidance for the Full Year of 2022