As a result of the Montara shut-in and the performance of the wider production portfolio year-to-date, the Jadestone Energy plc now expects that 2022 production will average between 13,000 and 14,000 boe/d. This compares to the announcement on 20 June 2022, which signalled that 2022 production would likely be around 15,500 boe/d, being the lower end of the previous guidance range. The revised 2022 production guidance reflects the Company's assumption that production from its non-operated assets offshore Peninsular Malaysia will now remain shut in for the remainder of 2022, due to ongoing delays in reinstating operations.