GUADALUPE UNDERGROUND DRILLING - NEW DISCOVERY
Underground drilling south from Level 140 of the
True widths are interpreted to be 85-100% of drill intervals. Hole UG-002-24 was drilled 50 metres to the northwest of the new discovery area and intersected low grades. The wide, high grade intersection in hole MPZ-UG-001-24 is interpreted to be locally thickened by stacked splay veins off the main vein.
The Kena Vein South has now been drill tested over a length of 150 metres from mine Level 140 and is open for extension to the southeast, updip and downdip. Drilling is continuing.
CEO STATEMENT
President and CEO
ABOUT
Quality Control/Quality Assurance
Samples reported in this news release were analyzed by
Contact:
Tel: (604) 681 0172
Email: inquiries@impactsilver.com
Forward-Looking and Cautionary Statements
This IMPACT News Release may contain certain 'forward-looking' statements and information relating to IMPACT that is based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. All statements, other than statements of historical facts, included herein, including, without limitation, statements relating to future silver prices, interpretation of drill results, future work plans, the timing of closing of the Offering, proceeds received and use of funds, the potential of the Company's projects, and potential and plans for the Plomosas project, are forward looking statements. Forward-looking information is often, but not always, identified by the use of words such as 'seek', 'anticipate', 'plan', 'continue', 'planned', 'expect', 'project', 'predict', 'potential', 'targeting', 'intends', 'believe', 'potential', and similar expressions, or describes a 'goal', or variation of such words and phrases or state that certain actions, events or results 'may', 'should', 'could', 'would', 'might' or 'will' be taken, occur or be achieved. There is no assurance that (i) the Company will be able to complete the Offering on the terms set out above, or at all, or (ii) that the proceeds of the Offering will be expended as contemplated.
Such forward-looking information involves known and unknown risks and assumptions, including with respect to, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement, except as required by law.
The Company's decision to place a mine into production, expand a mine, make other production related decisions or otherwise carry out mining and processing operations, is largely based on internal non-public Company data and reports based on exploration, development and mining work by the Company's geologists and engineers. The results of this work are evident in the discovery and building of multiple mines for the Company and in the track record of mineral production and financial returns of the Company since 2006. Under NI 43-101 the Company is required to disclose that it has not based its production decisions on NI 43-101 compliant mineral resource or reserve estimates, preliminary economic assessments or feasibility studies, and historically such projects have increased uncertainty and risk of failure.
(C) 2024 Electronic News Publishing, source