GLOBAL ATOMIC CORPORATION
Advancing the Dasa Uranium Project in the Republic Of Niger
Corporate Presentation
MARCH 2024
Disclaimer
This presentation has been prepared by the Global Atomic Corporation ("Global Atomic" or the "Company") and includes information from sources believed by management to be reliable. No representation or warranty, expressed or implied, is made as to the accuracy of the information set forth herein. The information contained herein is as of the date hereof and is subject to change, completion or amendment without notice.
This presentation contains forward-looking statements, estimates and projections with respect to the anticipated future performance of the company that may be deemed to be "forward-looking statements." These statements, estimates and projections reflect various assumptions made by the Company concerning anticipated results, which may or may not prove to be correct.
All statements contained in the presentation that address operating performance, future direction, management and control of the Company, events or developments that are expected to occur in the future (including statements related to earnings, expectations, sales of assets, capital expenditures, or statements expressing general optimism about future operating results) are forward-looking statements. Actual results could differ materially from those reflected in the forward-looking statements contained herein as a result of a variety of factors, many of which are beyond the Company's control.
All monetary amounts are in U.S. dollars, unless otherwise stated.
TSX: GLO | OTCQX: GLATF | FRA: G12 | 2 |
URANIUM
Republic of Niger
Uranium will fuel the global reactor fleet to generate clean baseload power.
ZINC RECYCLING
Iskenderun, Türkiye
Zinc concentrate produced by recycling Electric Arc Furnace Dust (EAFD), is a key component in this region's circular economy.
LOW-CARBON BASELOAD POWER & MINERAL RECYCLING
HQ | |
Canada | Zinc |
Türkiye | |
Uranium | |
Niger |
TSX: GLO | OTCQX: GLATF | FRA: G12 | 3 |
0000
Opening Blast Ceremony, November 2022
DASA PROJECT the only greenfield uranium project under
development today
TSX: GLO | OTCQX: GLATF | FRA: G12 | 4 |
Dasa is the highest- grade uranium deposit in Africa, situated in Niger's established uranium district
TSX: GLO | OTCQX: GLATF | FRA: G12 | 5 |
GLOBAL ATOMIC AT A GLANCE
Highest Grade Deposit: outside of the Athabasca Basin
Mining: began November 2022, ramp already at top of ore body
Financing: processing plant construction funding in progress
Off-takes: uranium sales contracts signed with utilities
Updated Mine Plan and Feasibility Study: expected in H1 2024
ESG: EP4 & IFC Performance Standards; audited by Development Banks
Permits & Team: all permits secured; Niger operating team engaged
Commissioning Q4 2025: ramp development & infrastructure construction ongoing
LOWEST QUARTILE PRODUCER
TSX: GLO | OTCQX: GLATF | FRA: G12 | 6 |
HIGHEST GRADE URANIUM PROJECT IN AFRICA
Phase 1 Mine Plan represents ≈20% of Dasa's current Mineral Resource
Phase 1: 12 years
Dasa Project schematic long-section and hypothetical underground infrastructure.
Phase 1 - Flank Zone, initial 12 years
Phase 2 - Future Mine Development
Phase 3 - Surface Mineralization
TSX: GLO | OTCQX: GLATF | FRA: G12 | 7 |
2019 MINERAL RESOURCE ESTIMATE
M&I Resources from the 2019 MRE were incorporated into the 2021 Phase 1 Feasibility Study to extract 44Mlb (~20% of the ore body) over 12 years
2023 MINERAL RESOURCE ESTIMATE
2021-22: 16,000-meter drill program converted more Inferred Resources into M&I
Q1 2024: Updated Feasibility Study will increase mineable Reserves for Phase 1 and beyond
TSX: GLO | OTCQX: GLATF | FRA: G12 | 8 |
COMPARATIVE GRADE / TONNAGE REPORT AT VARYING CUT-OFF GRADES
LARGE,
Cut-Off
Category
July 2019 Estimate | May 2023 Revised Estimate | % Change | ||||
Tonnes | Uranium | Contained | Uranium | Contained | Contained | |
Content | Uranium | Tonnes | Content | Uranium | Uranium | |
(Mt) | eU3O8 | eU3O8 | (Mt) | eU3O8 | eU3O8 | eU3O8 |
(ppm) | Mlbs | (ppm) | Mlbs | Mlbs |
HIGH-GRADE STRATEGIC ASSET
100 | Indicated | 81.6 | 718 | 129.1 | 103.6 | 803 | 183.5 | 42% |
Inferred | 96.1 | 606 | 128.4 | 71.0 | 636 | 99.5 | -23% | |
320 | Indicated | 32.0 | 1,530 | 108.0 | 44.9 | 1,602 | 158.5 | 47% |
Inferred | 35.0 | 1,333 | 102.7 | 25.4 | 1,435 | 80.4 | -22% | |
1,200 | Indicated | 7.9 | 4,483 | 78.0 | 12.6 | 4,201 | 117.1 | 50% |
Inferred | 8.4 | 3,783 | 69.9 | 5.9 | 4,320 | 56.1 | -20% | |
1,500 | Indicated | 6.2 | 5,328 | 73.1 | 10.1 | 4,926 | 109.6 | 50% |
Inferred | 6.3 | 4,563 | 63.7 | 4.4 | 5,349 | 51.4 | -19% | |
2,500 | Indicated | 3.6 | 7,849 | 61.9 | 5.7 | 7,258 | 91.0 | 47% |
Inferred | 3.4 | 6,838 | 51.4 | 2.4 | 8,211 | 43.2 | -16% | |
10,000 | Indicated | 0.6 | 24,401 | 31.1 | 0.9 | 22,185 | 43.5 | 40% |
Inferred | 0.8 | 14,598 | 25.3 | 0.6 | 18,362 | 25.3 | 0% | |
TSX: GLO | OTCQX: GLATF | FRA: G12 | 9 |
2024 FEASIBILITY STUDY HIGHLIGHTS
Production: 68.1 Mlbs U3O8 over 23 years
Reserve Grade: 4,113 ppm; 5,109 ppm in the first 12 years
Yellowcake deliveries are scheduled to begin Q1 2026
Feasibility Study is based on the 2023 MRE @ $75/lb
Dasa Project Economic sensitivity with varying uranium prices (USD)
Uranium Price ($/lb) | $60 | $75 | $90 | $105 |
Before-tax NPV8% | $656 M | $1,122 M | $1,572 M | $2,022 M |
After-tax NPV8% | $551 M | $917 M | $1,269 M | $1,621 M |
After-tax IRR | 27.9% | 38.4% | 47.1% | 55.1% |
- Cash cost per pound represents mining, processing, onsite and offsite general and administrative costs, selling expenses and royalties, divided by recovered U3O8.
- All-insustaining cost per pound of uranium represents mining, processing, site and offsite general and administrative costs, royalties and sustaining capital expenditures including rehabilitation provision, divided by recovered U3O8.
TSX: GLO | OTCQX: GLATF | FRA: G12 | 10 |
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Global Atomic Corp. published this content on 04 March 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 05 March 2024 16:00:06 UTC.