GE Power India Limited has received purchase orders from NTPC Limited and Maharashtra State Power Generation Company Limited. Name of the entity awarding the order(s) /contract(s): NTPC Limited; Significant terms and conditions of order(s)/contract(s) awarded in brief: Servicing of Generator; Whether order(s) /contract(s) have been awarded by domestic/international entity: Domestic Entity; Time period by which the order(s)/contract(s) is to be executed: 6 Months; Broad consideration or size of the order(s)/contract(s): Base value as INR 60,768,635 (plus GST 18%). Name of the entity awarding the order(s) /contract(s): Maharashtra State Power Generation Company Limited; Significant terms and conditions of order(s)/contract(s) awarded in brief: Supply of Reheater rear pendent coils assembly for Unit 3&4 Khaperkheda TPS; Whether order(s) /contract(s) have been awarded by domestic/international entity: Domestic Entity; Time period by which the order(s)/contract(s) is to be executed: 9 to13 Months; Broad consideration or size of the order(s)/contract(s): Base value as INR 59,958,042 (plus GST 18%).