NEOENERGIA'S FACTBOOK
2021
DISCLAIMER
This presentation was prepared by Neoenergia S.A. ("NEOENERGIA") aiming to indicate the general situation and the progress of NEOENERGIA's business. Although the information contained in this document was prepared with the necessary care and diligence, the information provided herein accurately reflects the moment the information was consolidated, reflecting NEOENERGIA's current conditions and its point of view. Therefore, the information is subject to change. This presentation should be seen only together with the oral presentation made by NEOENERGIA and its Financial Statements. NEOENERGIA can not be held liable for any loss directly or indirectly arising from the use of this presentation or its content. The presentation is a property of NEOENERGIA and should not be reproduced, distributed or disclosed to third parties, or even used for any other purpose without the prior written consent of NEOENERGIA.
The Company points out that this presentation may contain statements that represent expectations and projections of NEOENERGIA about future events. These expectations involve a number of risks and uncertainties, and may therefore have results or consequences other than those discussed and anticipated.
For further information about the companies, please refer to the reports filed with the Securities and Exchange Commission (CVM) or the Investor Relations website ri.neoenergia.com.
/ www.neoenergia.com | Photo: Wind farm Caetité (BA) | 2 |
NEOENERGIA TODAY
/ www.neoenergia.com | 3 |
AT A GLANCE
NETWORKS
5 Distribution Companies
- Net Asset base: R$ 23,105 MM (1)
- Concession Area: ~841,000 km²
- Population: 37 MM
15 Transmission Companies
- Operational:
- 1.038 km
- 9 substations
- Under construction:
- 9 lots (5,6 thousand km)
Second largest distribution company in Brazil(2)
Increasing transmission capacity
RENEWABLES
Hydro Generation(3)
- 7 plants in operation:
3.0 GW - Long term PPAs, on average, end in 2039
- All hydros with GSF insurance (4)
Wind/Solar
Generation
- 17 Wind farms in operation: 0.5 GW
- 27 Wind farms under construction: 1.0 GW
-
2 Solar farms under construction (Luzia): 0.1
GW - Pipeline Greenfield: 1.2 GW (5) (Solar/Wind)
- PPA's, on average, end in 2036
Long term contracted renewable generation
LIBERALIZED
Thermo Generation
-
1 plant in operation:
0.5 GW
Commercialization
- Energy Commercialization
- Energetic Solutions
Competitive asset
strategically located
Broad Network: ~841.000km2 concession area
Teles Pires | Belo Monte | Wind farms | ||||
Cosern | Narandiba | |||||
Lot 6 (C) | ||||||
Lot 27 (B) | ||||||
Luzia | ||||||
PA | CE | RN | Potiguar | |||
PI | PB | Sul | ||||
PE | ||||||
Lot 4 (C) | AC | Wind farms | ||||
SEAL | ||||||
Dardanelos | ||||||
BA | Wind farms | |||||
MT | ||||||
Lot 9 (D) | ||||||
Baguari I | ||||||
Lot 3 (A) | GO | Celpe | ||||
Termope | ||||||
Corumbá III | MG | Lot 2 (E) | ||||
Lot 4 (B) | MS | ES | ||||
SP | RJ | Coelba | ||||
NC Comerc. | PR | Itapebi | ||||
SC | Wind farms | |||||
NC Energia | ||||||
Baixo Iguaçu | ||||||
Afluente T | ||||||
CEB-D | Narandiba | |||||
Lot 14 (A) | ||||||
Neoenergia | ||||||
Lot 22 (B) 1 (A) | Lot 20 (B) | NC Comerc. | ||||
Elektro | Lot 2 (A) | |||||
(A) Dec 2018 Auction (B) Apr 2017 Auction | (C) Dec 2017 Auction | (D) Dec 2019 Auction | (E) Dec 2020 Auction | |||
Long term contracted |
- Regulatory Asset Base as of December 2020. Calculated as the sum of Coelba's, Celpe's, Cosern's, Elektro's and CEB-D's Net Rab as per company's business plan. (2) In terms of consumers and RAB. (3) Data base: Dec'20, considers Neoenergia's % stake; (4) Except by Itapebi, which has 100% of its energy sold to NC; (5) Registred at EPE .
- www.neoenergia.com
Distribution | Hydro | Solar | generation | |
Transmission | Wind | Trading | Corporate | Greenfield/Construção |
4
SHAREHOLDERS STRUCTURE
FREE FLOAT | ||
Integrated company with | One of the largest pension funds | Company listed in the highest |
geographical diversification and | in Latin America, with participation | governance level of B3: Novo |
global leader in wind energy | in several infrastructure | Mercado |
companies |
51.04%¹ | 30.29% | 18.67%² | ||
NOTE: ¹ December 31st 2020: Iberdrola Energia S.A.(50%) and Iberdrola S.A.(1.04%); ² Free Float considers 0.04% from Management
/ www.neoenergia.com | 5 |
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original document
- Permalink
Disclaimer
COELBA - Companhia de Eletricidade do Estado da Bahia published this content on 31 March 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 08 April 2021 17:05:05 UTC.