Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.
中 國 中 鐵 股 份 有 限 公 司
CHINA RAILWAY GROUP LIMITED
(A joint stock limited company incorporated in the People's Republic of China with limited liability)
(Stock Code: 390)
This overseas regulatory announcement is made pursuant to Rule 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited.
Please refer to the attached "Announcement of China Railway Group Limited on Winning of Bids for Material Projects" published by China Railway Group Limited on the Shanghai Stock Exchange website on 5 August 2020 for your information.
By Order of the Board
China Railway Group Limited
Zhang Zongyan
Chairman
5 August 2020
As at the date of this announcement, the executive directors of the Company are ZHANG Zongyan (Chairman), CHEN Yun, WANG Shiqi and ZHANG Xian; the independent non-executive directors are GUO Peizhang, WEN Baoman, ZHENG Qingzhi and CHUNG Shui Ming Timpson; and the non-executive director is MA Zonglin.
A Shares Stock Code: 601390 | A Shares Stock Name: China Railway | Announcement No.: |
H Shares Stock Code: 00390 | H Shares Stock Name: China Railway | Lin 2020-053 |
Announcement of China Railway Group Limited on
Winning of Bids for Material Projects
The board of directors of China Railway Group Limited (the "Company") and all the directors hereby undertake that this announcement does not have any false or misleading statements or any material omissions, and assume the joint and several liabilities for the truthfulness, accuracy and completeness of the contents.
Recently, the Company has won the bids for the following material projects:
1. Domestic Material Projects
Unit: RMB10,000 Currency: RMB
Serial | Company Winning | Bid Amount | Contractual | |
Bidding Projects | of the | Project | ||
No. | the Bid | |||
Company | Duration | |||
Railway Projects | ||||
Section SJSG-2 of the EPC contract for the | ||||
China Railway | civil engineering and relating construction | 2,009 | ||
1 | Tunnel Group Co., | project for the Pearl River Estuary Tunnel | 199,721 | calendar |
Ltd. | Segment of the new Shenzhen - Jiangmen | days | ||
Railway | ||||
China Railway No. 1 | ||||
Engineering Group | ||||
Co., Ltd., China | Section S1 of the EPC contract for the new | |||
2 | Railway No. 3 | 86,786 | 24 months | |
Aksu - Aral Railway | ||||
Engineering Group | ||||
Co., Ltd. and other | ||||
parties | ||||
Construction project of five station buildings, | ||||
production and living buildings and related | ||||
China Railway | projects, customer service information system | |||
3 | Construction | integration and related projects along Hubei | 52,515 | 448 calendar |
Engineering Group | Segment of the new Zhengzhou - Wanzhou | days | ||
Co., Ltd. | Railway; EPC contract for Section ZWHBZF-3 | |||
of Huangmei South Station of the new Anqing | ||||
- Jiujiang Railway |
Highway Projects
China | Railway | Construction | project | of Section JGSG-1 | of | 1,461 | |||||
Yashiga | - Ashigong | Segment of Jianzha | - | ||||||||
4 | Tunnel | Group Co., | 167,298 | calendar | |||||||
Gonghe Highway project of National Highway | |||||||||||
Ltd. | days | ||||||||||
310 | |||||||||||
China Railway No. 4 | Construction project of the south segment | ||||||||||
5 | Engineering Group | (Phase II) of Fangong Road in downtown area | 81,607 | 24 months | |||||||
Co., Ltd. | in Yancheng City | ||||||||||
China Railway No. 7 | |||||||||||
Engineering Group | |||||||||||
Co., Ltd. and | Section SG02 of the second batch of civil | ||||||||||
6 | China | Railway | project for Conghua - Huangpu Expressway | 81,476 | - | ||||||
Construction | (Phase I) in Guangzhou City | ||||||||||
Engineering | Group | ||||||||||
Co., Ltd. | |||||||||||
China | Railway | ||||||||||
Construction | EPC contract for the design and construction | ||||||||||
7 | Engineering | Group | project of Huibu - Hejia Highway in Changshan | 56,816 | 30 months | ||||||
Co., Ltd. and other | County, Quzhou City | ||||||||||
parties | |||||||||||
Municipal and Other Projects | |||||||||||
China | Railway | EPC contract for the shantytown renovation | |||||||||
8 | Tunnel | Group Co., | project in Dengwang area (Plot C), Nanguan | 370,792 | 720 calendar | ||||||
Ltd. | and | other | Beigu area and Tucheng area in Dongchangfu | days | |||||||
parties | District, Liaocheng City | ||||||||||
China Railway | |||||||||||
Construction | |||||||||||
Engineering Group | Section | 02 | of | the | comprehensive | 1,553 | |||||
Co., Ltd., China | |||||||||||
9 | transportation hub project for Beijing Municipal | 329,417 | calendar | ||||||||
Railway No. 1 | |||||||||||
Sub-center Station | days | ||||||||||
Engineering Group | |||||||||||
Co., Ltd. and other | |||||||||||
parties | |||||||||||
China Railway No. 2 | |||||||||||
Engineering | Group | 486 calendar | |||||||||
10 | Co., Ltd. | and | Section II and IV of warehouse vehicle base of | 181,172 | days - 494 | ||||||
China | Railway | Hangzhou Airport Rail Express project | calendar | ||||||||
Tunnel | Group Co., | days | |||||||||
Ltd. | |||||||||||
China | Railway | ||||||||||
11 | Construction | EPC contract for Lunan · Jinyu Jiayuan project | 145,780 | 730 calendar | |||||||
Engineering | Group | days | |||||||||
Co., Ltd. |
China | Railway, | ||||||||||||||||
China Railway No. 1 | |||||||||||||||||
Engineering | Group | EPC | contract | for | electromechanical | ||||||||||||
12 | Co., | Ltd. | and | engineering project of the west extension of | 120,981 | - | |||||||||||
Wuhan | Railway | Shunde Segment of Rail Transit Line 7 (Phase | |||||||||||||||
Electrification | I) project in Guangzhou City | ||||||||||||||||
Bureau | Group | Co., | |||||||||||||||
Ltd. | |||||||||||||||||
China Railway No. 3 | Section | of | parking | lot | of | the | construction | 560 calendar | |||||||||
13 | Engineering | Group | project | of | Subway | Line | 9 | (Phase | I) | in | 114,251 | ||||||
days | |||||||||||||||||
Co., Ltd. | Hangzhou City | ||||||||||||||||
China | Railway | No. | |||||||||||||||
14 | 10 | Engineering | Workshop | (J17#-J20#) | project | at 4# | plot | in | 111,651 | 407 calendar | |||||||
Group | Co., | Ltd. | Zibo Open Industrial Processing Center | days | |||||||||||||
and other parties | |||||||||||||||||
Section 1 (Section DSZQ-1) of the civil | |||||||||||||||||
China | Railway | engineering and relating construction project | 1,826 | ||||||||||||||
15 | Tunnel | Group | Co., | of the poverty alleviation project of Dujiangyan | 104,525 | calendar | |||||||||||
Ltd. | - Mount Siguniang Mountain Rail Transit | days | |||||||||||||||
project in Sichuan Province | |||||||||||||||||
China Railway No. 2 | Section VII-TS-05 of the civil engineering | 1,448 | |||||||||||||||
16 | Engineering | Group | project of Rail Transit Line 7 (Phase II) and | 97,835 | calendar | ||||||||||||
Co., Ltd. | Line 8 (Phase IV) in Suzhou City | days | |||||||||||||||
China Railway No. 4 | Section SHNL-SG-4 of the EPC contract for | ||||||||||||||||
17 | Engineering | Group | the expressway transformation project of the | 96,364 | 18 months | ||||||||||||
Co., Ltd. | South Third Ring Road in Xuzhou City | ||||||||||||||||
China Railway No. 2 | Sections 2, 3 and 4 of the principal and | ||||||||||||||||
18 | Engineering | Group | auxiliary construction project of Evergrande | 91,700 | - | ||||||||||||
Co., Ltd. | Jiujiawan Project (Phase I) in Urumqi | ||||||||||||||||
China Railway No. 5 | Pingdingshan Urban Exhibition | Centre and | 731 calendar | ||||||||||||||
19 | Engineering | Group | ancillary | housing and | underground | garage | 83,109 | ||||||||||
days | |||||||||||||||||
Co., Ltd. | project (Phase 1 of Taiyangcheng) | ||||||||||||||||
China | Railway | No. | EPC contract for Section ZBZG-1 of the | ||||||||||||||
20 | 10 | Engineering | passenger | transport | facilities | renovation | 78,612 | 36 months | |||||||||
Group Co., Ltd. | project of Zibo Railway Station | ||||||||||||||||
China | Railway | EPC contract for the affordable housing | |||||||||||||||
Electrification | (settlement house) in Plot 3 of Yaozhuang in | ||||||||||||||||
the airport noise zone of Yaozhuang Area | 900 calendar | ||||||||||||||||
21 | Engineering | Group | 69,936 | ||||||||||||||
Co., | Ltd. and other | Development Project (including the road | days | ||||||||||||||
parties | network to the west of Zhaobing River) in Luhe | ||||||||||||||||
District, Nanjing City | |||||||||||||||||
China Railway No. 5 | Principal and auxiliary construction project of | 558 calendar | |||||||||||||||
22 | Engineering | Group | Sections 13# and 15# in Guiyang Evergrande | 65,500 | |||||||||||||
days | |||||||||||||||||
Co., Ltd. | Fairyland | ||||||||||||||||
China Railway No. 5 | EPC contract for Plot DU09-69 of the talent | |||||||||||||||
23 | Engineering | Group | housing project in the airport land in Shenzhen | 64,972 | 858 calendar | |||||||||||
Co., Ltd. | and | City | days | |||||||||||||
other parties | ||||||||||||||||
China | Railway | Municipal project of Buji Sanlian Road in | 474 calendar | |||||||||||||
24 | Tunnel Group Co., | 62,454 | ||||||||||||||
Ltd. | Longgang District, Shenzhen City | days | ||||||||||||||
China Railway No. 4 | Section SG02 of the renovation and expansion | |||||||||||||||
25 | Engineering | Group | project of Xiaolin - Tangqi Segment in Yuhang | 60,088 | 24 months | |||||||||||
Co., Ltd. | District of S304 Highway | |||||||||||||||
China Railway No. 8 | EPC | contract | (design, | survey | and | |||||||||||
26 | Engineering | Group | construction) | of | the | comprehensive | 54,406 | 24 months | ||||||||
Co., Ltd. | and other | construction project of the funeral parlor in | ||||||||||||||
parties | Wanshan District, Tongling City | |||||||||||||||
2. Overseas Material Project | ||||||||||||||||
Serial | Company | Bid Amount of the | RMB Equivalent | Contractual | ||||||||||||
Bidding Project | Project | |||||||||||||||
No. | Winning the Bid | Company | (RMB10,000) | |||||||||||||
Duration | ||||||||||||||||
China | Railway | Construction project | TZS129,740.29 | |||||||||||||
1 | Construction | of | Judiciary | of | 40,228 | 30 months | ||||||||||
Engineering | million | |||||||||||||||
Tanzania in Dodoma | ||||||||||||||||
Group Co., Ltd. | ||||||||||||||||
The above bids amounted to approximately RMB30,699.92 million in aggregate, representing approximately 3.62% of the operating revenue of the Company in 2019 prepared under the China Accounting Standards.
Notice is hereby given.
The Board of Directors of China Railway Group Limited
6 August 2020
Attachments
- Original document
- Permalink
Disclaimer
China Railway Group Limited published this content on 05 August 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 05 August 2020 11:21:21 UTC