Chesser Resources Limited reported drilling results from its Diamba Sud Project in Senegal, West Africa. Assay results received to date from zones of intense hydrothermal alteration in first diamond holes (DD) drilled at Area A within the Northern Arc target confirm high-grade gold discovery. First diamond hole confirms high-grade nature and style of mineralisation, with potential structural control. Select significant intersections from hole DSDD01 including; 4m at 9.36 g/t gold from 14m, in saprolite, including; 2m at 18.20 g/t gold from 14m and; 16m at 8.51 g/t gold from 86m, in fresh rock, including; 10m at 13.11 g/t gold from 86m; Results from other altered sections of the hole pending. Step-out holes at Area A extend the gold mineralisation up-dip and along strike for at least 300m with partial assay results from 3 DD and full results from 12 reverse circulation (RC). Selected significant intersections including; Hole DSDD02 - 50m step out south (partial results): 14m at 5.18 g/t gold from 0m, including; 4m at 15.44 g/t gold from 8m; 6m at 5.11 g/t gold from 90m, including; 3m at 6.76 g/t gold from 93m. Hole DSDD04 - 50m step out north (partial results): 6m at 4.91 g/t gold from 70m, including; 3m at 7.11 g/t gold from 70m; 5m at 3.75 g/t gold from 83m, including; 1m at 11.40 g/t gold from 86m. Hole DSR115 ­ 200m step out south: 10m at 3.41 g/t gold from 78m; 4m at 13.28 g/t gold from 103m, including; 2m at 24.43 g/t gold from 103m. Gold mineralisation associated with wide zones of intense albite-carbonate-silica-pyrite alteration, with marked similarities to that seen at the nearby, world-class, Gounkoto-Loulo mining complex adjoining the prolific Senegal-Mali shear zone (SMSZ). Potential remains to extend the gold mineralisation at Area A to the northeast, east and south, where the alteration zones remain open and untested in these directions. Scope of work for Phase 3 is for at least 2,000m of DD and 2,500m of RC drilling to be completed by early February, fully funded from existing cash reserves.