Chakana Copper Corp. to release results for two additional drill holes from the recently-announced discovery at the Huancarama Breccia Complex, within the Soledad Project in Ancash, Peru. The holes complement the initial eight holes that were published on January 12, 2021. Drilling at Huancarama is ongoing where eighteen HQ diamond core holes have been completed thus far. Holes SDH20-161 and SDH20-162 were drilled to the northeast from the south side of the breccia complex. Both holes intersected continuous mineralization across the breccia body previously defined by the first eight holes and an historical tunnel that transects the breccia. Hole SDH20- 161 was oriented directly beneath a collapse zone and intersected 107m with 0.28 g/t Au, 0.42% Cu, and 33.7 g/t Ag (1.36 g/t Au-eq) starting at 86m; hole SDH20-162, drilled beneath the west edge of the collapse zone, encountered 120.4m with 0.51 g/t Au, 0.83% Cu, and 34.6 g/t Ag (3.71 g/t Au-eq) from 101.3m depth, including 72.2m with 0.79 g/t Au, 1.32% Cu, and 46.9 g/t Ag (3.42 g/t Au-eq) from 101.3m. A higher-grade zone of 30.0m with 1.44 g/t Au, 2.55% Cu, and 88.2 g/t Ag (6.50 g/t Au-eq) starting at 109.0m depth occurs within this interval.