Cerrado Gold Inc. reported production results for the first quarter ended March 31, 2024. For the quarter, the company reported total mined of 2,892,000 tonnes. Ore Mined CIL was 85,000 tonnes.

Ore mined for Calandrias Heapleach was 189,000 tonnes. Waste Mined was 2,618,000 tonnes. Gold Produced was 11,204 oz.