Capstone Turbine Corporation announced that it has secured an order for a C200 Signature Series integrated cooling, heat and power (ICHP) solution that is destined for an award-winning luxury resort in Jamaica looking to reduce their carbon footprint as well as their annual operating costs. Secured by Innovative Energy Company Limited (IEC), Capstone’s distributor in Jamaica, the order is scheduled to be commissioned and provide prime power and hot water beginning in March 2019. The C200 Signature Series ICHP microturbine solution includes a 300 kW thermal integrated Capstone heat recovery module and will run as a standalone system on liquefied petroleum gas (LPG).