Camino Corp. announced the results of the last four pending drill holes (Holes DCH-71, 72, 73, and 74) from the 2020 drill campaign on its Los Chapitos copper project located in Southern Peru's Arequipa Department. Significant intercepts in the remaining four drill holes of the 2020 campaign include DCH-071 with 55.5 m of 0.72% copper (Cu) (incl. 22.5 m at 1.15% Cu) and near-surface DCH-074 with 64.5 m of 0.6% Cu (incl. 12 m at 1.05% Cu). This is in addition to company first drill hole DCH-066 that intersected near-surface 92.1 m of 0.53% Cu (incl. 20.8 m at 0.97% Cu). The company intercepted copper mineralization in 8 out of 9 drill holes for the 2020 drill program. The program consisted of 9 HQ diamond drill holes totaling 2,358.1 m and brings the overall meterage on the property to 21,519 m. Core has been logged and sampled at the Company's facilities in the town of Chala, 15 km from the project. Industry standard chain of custody and QA/QC practices are followed with samples sent to Lima where they are analyzed by ICP-MS ALS at Chemex's facility.