Rubicon Minerals Corporation provided assay results from its 2018 infill drilling program at the Phoenix Gold Project. 2018 Infill Drilling Results from the 2018 Exploration Program: In 2018, Rubicon completed approximately 20,000 m of oriented diamond drilling from the 305-, 610- and 685-m levels. The primary purpose of the drilling was to potentially upgrade the Inferred Resources of the 2018 Mineral Resource Estimate of the Project, to the Measured and Indicated categories. Longitudinal, plan and section views of the drilling, which highlight intersections in the High-Ti Basalts, are presented in Diagrams 1 to 22 at the end of the news release. In 2019, the Company continues drilling activities from the 685-m level and 610-m level exploration drift to target the deeper portions of the F2 Gold Deposit, between the 854- and 1,600-m levels.