Maya Gold & Silver Inc. announced that its shareholders it has reached an important milestone with the installation of the last component of the mill operation which has a 3 fold effect milling capacity and output at its Zgounder silver mine. The commissioning and testing phase of its 500 ton per day (tpd) flotation mill has been completed and the company is proud to announce that it is in commercial production as of January 1st 2019. During a 28-day period, a total of 4622 tonnes of low-grade ore with an average silver grade of 157 g/t was processed. The overall silver recovery with flotation followed by cyanidation of the flotation concentrate reached 80.3% (including in the system silver metal balance) which is better than expected for the testing phase. The flotation mill produced 321 tonnes of concentrate at a grade of 1861 g/t Ag for a 7 % weight recovery.