Australian Potash Limited announced the final assay results for the diamond drilling (DD) completed at the Lake Wells Gold JV by joint venture partner St Barbara Limited (SBM). A follow-up drill program to further understand the geographical scale of mineralisation has been planned, with mobilisation of field crew and a diamond drill rig in late First Quarter FY22. The proposed follow up program comprises up to 16 diamond drill holes, for approximately 4,200m. Preliminary exploration work conducted by APC, and continued by SBM, has sought to understand the geology and mineralisation potential of the Yamarna area which hosts the fertile Yamarna Shear Zone. During FY21, a third phase of aircore (AC) drilling was completed for an additional 19,853m. A first phase of reverse circulation (RC) (18 holes, 2,328m) and diamond drilling (three holes for 1,034m) was also completed. APC has been advised that a work program of up to 16 diamond drill holes for 4,200m is planned for FY22. Along with the diamond drilling there will be the associated assay and geochemical analysis, structural logging, and lithological analysis all to be completed to understand the scale and significance of the mineralisation discovered in the FY21 exploration programs. Mobilisation for the diamond drilling program is anticipated to commence in late First Quarter with the drilling component of the program to be completed by end of Q2.