Arrow Minerals Limited announced to provide results from the drilling programme completed in late 2017 at the T6, T2 and T1 prospects at its 100% owned Barlee Gold Project, 100km west of Menzies in Western Australia. A maiden drill programme was completed at the T6 prospect, including 29 aircore holes (1,401m) and six reverse circulation (RC) holes (612m). At the T1 and T2 prospects, seven reverse circulation (RC) holes and two diamond holes were drilled to follow up on areas of gold mineralisation identified in the September 2017 drilling programme. The T6 prospect is located in the Yerilgee greenstone belt and was defined by a 4.2km x 1.3km gold-in-soil anomaly, adjacent to a late stage granitic intrusion and a project scale NNE trending structure. Drilling was undertaken to confirm gold mineralisation underlying the soil samples and identify the underlying lithology. A total of 29 aircore holes spaced 160m apart were drilled over three lines across the soil anomalies. Initial aircore drilling intersected a mineralised and brecciated silicified body and several of the holes intersected sulphide altered mineralised dacitic porphyry. Based off these field observations, six RC holes were drilled into the silicified breccia body and the mineralised porphyry. BARRC025 returned a significant intersection of 27m @ 0.57g/t Au and 18.7g/t Ag from 8m, with higher grade intercepts including 1m @ 1.5g/t Au and 128g/t Ag from 11m and 1m @ 2.09g/t Au and 41.2g/t Ag from 16m. The T2 prospect is located in the Mt Elvire greenstone belt adjacent to the regionally significant Evanston Shear and has been defined by a 5km x 1.5km gold-in-soil anomaly. The T2 prospect was first drilled in July 2017, with BARRC007 intersecting 48m @ 0.7g/t Au from 27m including 21m @ 1.1g/t Au and 3m @ 2.3g/t Au. The follow up drill programme was designed to extend previously drilled fence lines and step out from previous intercepts. An additional seven RC holes (882m) were completed, with hole BARRC030 intersecting 3m @ 0.4g/t Au from 9m including 1m @ 1.1g/t Au. The follow up drill programme has further confirmed bedrock gold anomalism over 1.2km of strike and remains open in all directions. In addition to the follow up RC drilling programme, Arrow completed a diamond drill hole to confirm mineralisation and controlling structures as well as collect samples for petrophysics. The diamond hole (BARDD002) twinned RC hole BARRC007 and confirmed the magnitude and thickness of mineralisation with assay results of 34m @ 0.5g/t Au from 32m including 1m @ 2.0g/t Au, 7m @ 1.0g/t Au from 50m and 1m @2.9g/t Au from 56m. In field logging has identified multiple phases of hydrothermal quartz­sulphide veining, with mineralised structures perpendicular to drilling.