Arras Minerals Corp. announce the results from the re-analysis of samples from three historic diamond drill holes from the Berezski East project (?Berezski East? or the ?Project?) located within the Company?s Elemes exploration licence (Elemes or the Licence) in northeastern Kazakhstan.

The Elemes licence is not included in the Teck-Arras Strategic Exploration Alliance announced on December 7, 2023. Highlights from the Re-Assay include: Bz6 - 108.0 meters (?m?) of mineralization grading 0.94 %CuEq or 1.33 /t AuEq (1.30 g/t gold (Au), 0.19 % copper (Cu) and 1.5 g/t silver (Ag)) starting at surface. Including30.8 m grading 2.21 % CuEq or 2.66 g/t AuEq (3.14 g/t Au, 0.39 % Cu and 3.0 g/t Ag) starting at surface.

Bz16 - 46.0 m of mineralization grading 0.71 %CuEq or 0.86 g/t AuEq (0.95 g/t Au, 0.17 % Cu and 0.8 g/t Ag) starting at 87.0 m depth down-hole. Including18.0 m grading 1.05 % CuEq or 1.28 g/t AuEq (1.54 g/t Au, 0.17 % Cu and 0.7 g/t Ag) from 102.0 m depth down-hole. Bz20 - 94.0 m of mineralization grading 0.59 %CuEq or 0.71 g/t AuEq (0.81 g/t Au, 0.12 % Cu and 0.9 g/t Ag) starting at 199.0 m depth down-hole.

Including42.0 m grading 0.99 % CuEq or 1.20 g/t AuEq (1.43 g/t Au, 0.17 % Cu and 1.0 g/t Ag) from 227.0 m depth down-hole. The Berezski East Project: is located within the 425 square kilometre Elemes mineral exploration licence. The Elemes license is located within the Bozshakol-Chingiz metallogenic belt that also hosts the Company?s flagship Beskauga porphyry copper-gold project approximately 80 km to the east, and KAZ Minerals?

Bozshakol porphyry copper-gold mine approximately 60 km to the northwest. Elemes benefits from excellent modern infrastructure and ease of accessibility, being located only 20 kilometres (?km?) from Arras? operational base in the city of Ekibastuz, northeastern Kazakhstan.

A paved highway runs through the license, and within 1 km of the Berezski East project. 1100 KVA power lines and heavy rail all lie within a 15 kilometer radius of the project. Re-logging, Assay, QAQC Procedures: All available drill core from Berezski East have been re-logged in detail by Arras employees for lithology, structure, alteration and mineralization.

In addition, Arras also measured several petrophysical properties on the drill core including density, magnetic susceptibility, conductivity, resistivity and induced polarization. High resolution photographs of all drill core were captured using Seequent's Imago cloud-based image management software. The core was also analyzed for alteration minerals using TerraSpec SWIR/NIR spectroscopy, with final interpretation pending.

The re-assayed coarse rejects from Berezski East were prepared in Arras' in-house sample preparation laboratory in Ekibastuz by Arras employees. As the coarse rejects had been in dry storage since 2007/08, they were first re-homogenized by passing through a roller crusher (<2 mm), before being split using a riffle splitter. An approximately one-kilogram split was then pulverized using cup vibration mills to below 75-microns.

The pulp was then split again, with 250 g shipped to Stewart Assay and Environmental Laboratories LLC ("SAEL"), located in Kara-Balta in Kyrgyzstan, for geochemical analysis. Prior to analysis, SAEL undertook Quality Assurance and Quality Control (QA/QC) on selected pulps, ensuring 85 % passing below -75-microns. A 30 g aliquot was then analyzed for gold content by fire assay with an Atomic Absorption Spectroscopy (AAS) finish (SAEL method: Au-AA25TM).

A second pulp split was analyzed for 46 elements by a combination of Inductively Coupled Plasma Mass Spectrometry (ICP-MS) and Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES) after four-acid digestion on a 1.0 g aliquot (SAEL method: MA/UTTM). All samples exceeding 1% copper were re-analyzed using a 4-acid digest ICP-MS ore grade method. SAEL laboratory is accredited to ISO 17025:2005 UKAS ref 4028 and have internal QA/QC programs for monitoring accuracy and precision.

Internal QA/QC samples were inserted by the analytical laboratory and reviewed by the Company prior to release. No material QA/QC issues have been identified. SAEL is entirely independent of the Company.