Arizona Silver Exploration Inc. announced plans for a first quarter drilling program at its 100% owed Ramsey Silver Project located in La Paz County, Arizona. Arizona Silver Exploration Inc. has completed plans to resume exploration drilling at its Ramsey silver project beginning February, 2018. The plan calls for an initial 1,000 metres of reverse circulation (RC) drilling in six holes immediately east of the silver-bearing drill intercepts from 2016 and 2017, which produced intercepts of 44.2 metres (145 feet) of 62.5 grams per tonne (gpt) Ag in hole R1706 and 53.3 metres (175 feet) of 37.3 gpt Ag in hole R1707. These initial six holes will be located on patented claims (private land), and roadwork and drill site preparation will commence the end of January, with permitting of the drill holes with the Arizona Department of Water Resources to follow in early February. Another nine to ten holes are tentatively planned for second quarter of 2018 to be drilled further to the east of these initial six holes on both patented and unpatented mining claims, the final locations to be selected based upon the results of these initial six holes.