Moscow, January 30th, 2020 - PJSC Enel Russia published its operating data relating to the fourth quarter and full year of 2019.



'Our 2019 operating results were predictably influenced by a combination of internal factors, including a transformation in the company's asset portfolio, and external ones. Nevertheless, favorable market and our effective managerial actions allow us to confirm our guidance for the corresponding 2019 financial results.'

- Carlo Palasciano Villamagna, General Director of Enel Russia

FY 2019 FY 2018 Δ yoy
4Q 2019

Power plant

GWh % Weight GWh % Weight % GWh
Konakovskaya 5 967 17,4% 6 748 16,3% -11,6% 1 480
Nevinnomysskaya 7 097 20,8% 7 925 19,2% -10,4%
2 163
Reftinskaya 14 053 41,1% 19 592 47,4% -28,3% 0
Sredneuralskaya
7 086 20,7% 7 042 17,1% 0,6% 1 922
Enel Russia 34 203 100,00% 41 307 100% -17,2% 5 565
FY 2019 FY 2018 Δ yoy
4К 2019

Power plant

GWh % Weight GWh % Weight % GWh
Konakovskaya 5 698 17,6% 6 462 16,5% -11,8% 1 419
Nevinnomysskaya 6 750
20,8% 7 534 19,2% -10,4%
2 061
Reftinskaya 13 333 41,1% 18 572 47,4% -28,2% 0
Sredneuralskaya 6 652
20,5% 6 614
16,9% 0,6% 1 800
Enel Russia
32 433 100,00% 39 182
100% -17,2% 5 280

Net power output in 2019 decreased largely reflecting Reftinskaya power plant disposal from October 1st, 2019. Gas-fired power plants showed mixed dynamics, all backed by lower power demand in the first price zone due to higher average temperatures in 2019 versus 2018, and specifically:

  • Konakovskaya's output dropped by 11.8% resulting from lower equipment use by the System Operator due to overcapacity of the system;
  • Nevinnomysskaya's output decreased by 10.4% as weaker conventional gas units' output resulting from higher nuclear production in Southern Russia more than offset broadly stable CCGT unit performance;
  • On a positive side, Sredneuralskaya's output slightly increased (+0.6%) as higher CCGT unit production compensated lower production from conventional units mainly attributable to system overcapacity.


FY 2019 FY 2018 Δ yoy 4К 2019

Power plant

th GCal % Weight th GCal % Weight % th GCal
Konakovskaya 174
3,8% 187
3,8% -6,6% 53
Nevinnomysskaya 1 440
31,3% 1 504
30,7% -4,3%
454
Reftinskaya 305
6,6% 489
10,0% -37,7% 0
Sredneuralskaya 2 680
58,3% 2 722
55,5% -1,5% 996
Enel Russia 4 599
100,00% 4 903
100% -6,2% 1 503

Heat sales in 2019 decreased, mostly attributable to Reftinskaya disposal, as well as lower heat suppliers' consumption at all power plants due to average warmer temperatures versus 2018.



PJSC Enel Russia is a subsidiary of Enel Group. PJSC Enel Russia operates the following three gas power plants: Konakovskaya GRES, Nevinnomysskaya GRES and Sredneuralskaya GRES. The company's total gross installed electrical capacity is 5,628.7 MW (equivalent to 5,255.4 MW net installed capacity) and thermal capacity is 2,032 Gcal/h. The company currently operates coal Reftinskaya GRES of 3,800 MW. Besides that, PJSC Enel Russia implements three projects in the field of wind generation: Azovskaya WPP (90 MW), Kolskaya WPP (201 MW) and Rodnikovskaya WPP (71 MW). PJSC Enel Russia's authorized capital is 35,371,898,370 roubles, which is divided into ordinary shares with a par value of 1 rouble. The Enel S.p.A. share in the company's authorized capital is 56.43%, PFR Partners Fund I Limited's share is 19.03%, Prosperity Capital Management Limited's share is 7.68% and other minority shareholders' share is 16.86%. PJSC Enel Russia shares are listed in Level 1 MICEX quotation list. The company was established in Yekaterinburg on October 27, 2004 as OJSC OGK-5. On July 7, 2009 by the resolution of Annual General Shareholders' Meeting the company was renamed OJSC Enel OGK-5 and on August 8, 2014 the Federal Tax Service registered the new version of the company's charter with the name OJSC Enel Russia. On June 25, 2015 the company changed its legal type and was renamed PJSC Enel Russia. You can follow the company's news in social media such as Facebook, Instagram, Twitter and YouTube.

Attachments

  • Original document
  • Permalink

Disclaimer

PJSC Enel Russia published this content on 30 January 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 January 2020 16:09:01 UTC