Renegade Exploration Limited announced that it has received all of the results for its aircore drilling program completed at its Yandal East Gold Project in late 2018. The drilling program was successful, identifying both high grade and thick mineralization at multiple targets across the Project. The program consisted of 62 holes for 7,189m focussing on the follow up of mineralization identified during the inaugural program in mid-2018. Three of the five high priority follow-up targets were chosen for further work during November plus one of the original nine targets generated by Jon Hronsky of Western Mining Services in early 2018. The November program successfully identified significant mineralization including both high grade and thick mineralisation at the Mizina South and Ward Prospects. At the Ward Prospect, the company completed 19 holes for 2,207m. The holes were drilled along strike from significant mineralization identified in the inaugural aircore program earlier in 2018. Drilling was undertaken within a 600m undrilled corridor where 19 holes comprising 3 lines spaced 100m apart. Thick, significant mineralization was returned from multiple holes, the better intercepts include; 23m at 1.38 g/t Au from 84m, including, 8m at 2.04 g/t Au from 84m (YEAC0317), 20m at 1.02 g/t Au from 88m (YEAC0313), 10m at 0.95 g/t Au from 90m (YEAC0306), 60m at 0.21 g/t Au from 60m (YEAC0312). The southern end of the mineralization was previously interpreted to be closed off immediately north of a small dry lake. The Company drilled a single line on the very northern-edge of the lake in July and intersected significant mineralization including 6m at 1.40 g/t Au from 82m and 4m at 1.55 g/t Au from 61m. The company determined the mineralization to likely be continuous and still open with a 600m undrilled corridor which was the focus for the November program at Ward. The corridor is immediately south of some of the best drilling intercepts at Yandal East including 13m at 3.1 g/t Au from 61m. With one third of the 600m corridor obscured by a lake, the November drilling focused on the easily accessible 400m southern portion of the lake. The Company is excited by the results from this corridor and notably the thickness including intervals of 23m at 1.38 g/t Au from 84m and 20m at 1.02 g/t Au from 88m. These results confirm the prospectively of the previously undrilled corridor and the Company plans to continue exploration in this area to determine if higher grade, economic mineralization can be discovered in the immediate vicinity. Mizina South is one of the most exciting targets drilled in the inaugural aircore program at Yandal East in July 2018. The follow up program in November consisted of 15 holes for 1,717m. Holes were drilled on 4 new sections north and south of the previously identified mineralization with grades up to 5.74 g/t returned. Some of the better results include; 1m at 5.74 g/t Au from 83m, 1m at 4.11 g/t Au from 113m, 6m at 1.67 g/t Au from 80m. Millrose Extension was first drilled in mid-2018 when three lines separated by over 800m of strike length were completed. The northern most line intersected significant disseminated sulphides towards the base of several holes before YEAC0246 intersected mineralization, with 2m at 0.99 g/t Au from 87m returned from quartz veining within a silicified felsic schist and 4m at 0.31 g/t Au from 72m further up hole. The hole ended in mineralization and the hole immediately to the east encountered relatively shallow granite. The November program consisted of 19 holes for 2,207m with 2 lines either side of YEAC0246 and an additional line approximately 1,000m to the north, testing the same interpreted structure. The November drilling intersected a best result of 1m at 0.8 g/t Au from 102m on the southern-most line 200m south of the original mineralization. Millrose Extension remains a geologically interesting area with sulphide-bearing mafic schists,felsic schists and both solidification and quartz veining increasing towards a granite body. The internal granite may be an important control on mineralizing fluids in the area. Mineralization elsewhere in the region is located proximal to granite contacts, including the Millrose Deposit itself. The original target was chosen due to its proximity to the Millrose Deposit, the Celia Shear and other structural complexities. The Millrose Deposit is held by Bowlane Nominees (WA) Limited and contains 309,000 oz of gold at 2.4 g/t gold.