Oriri Rail Infrastructure Limited has secured orders worth INR 127,986,280.91 from Integral Coach Factory (ICF), Chennai, Indian Railways' and the details for the same are mentioned: significant terms and conditions of order(s)/contract(s) awarded in brief: Delivery is to be made to ICF: Furnishing Depot. Further, 90 % of payment to be received against Inspection Certificate issued by the nominated inspection agency as specified in the contract and proof of dispatch/delivery of the material and Balance 10 % after receipt, inspection and acceptance of the goods. nature of order(s) /contract(s): Manufacturing and Supplying of 208 sets of Seat and Berths for LWACCN coaches.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
263.6 INR | +0.11% |
|
-6.63% | +13.72% |
1st Jan change | Capi. | |
---|---|---|
+13.72% | 194M | |
+42.78% | 27.96B | |
+24.55% | 27.88B | |
+53.38% | 3.23B | |
-15.62% | 2.84B | |
+12.52% | 2.45B | |
+12.15% | 1.54B | |
+7.67% | 1.29B | |
+4.49% | 718M | |
-8.43% | 530M |
- Stock Market
- Equities
- ORVENPR Stock
- News Oriental Rail Infrastructure Limited
- Oriental Rail Infrastructure Limited Secures Orders from Integral Coach Factory