Kalyani Steels Limited has decided to install a Coke Making Facility and Heat Recovery Captive Power Plant, adjacent to its steel plant situated at Village Ginigera, Hospet Road, Koppal District, Karnataka. The existing plant capacity is of 700,000 TPA of carbon and alloy steels in straight length forms. The facilities at the steel manufacturing unit include Blast furnaces, Sinter plants, EOF, LF, VD, Bloom and Billet casters, bar and rod mill with all required auxiliaries and infrastructure. Coke is an essential primary input for smelting and extraction of iron in the blast furnace from iron ore, pellets or sinter. Hitherto, KSL did not have a coke making facility and had been outsourcing coke from various external sources in India and overseas. However, in order to improve its business performance, KSL has now decided to install a Coke Making Facility along with a Heat Recovery Captive Power Plant, adjacent to its steel plant facility. KSL is independently planning to set up a 200,000 TPA Non-recovery I Heat recovery, stamp charged Coke Oven with Modified wet Quenching of hot coke and 15-17 MW captive power plant to be operated utilising waste heat energy of flue gas generated from Coke Oven. The electrical power so produced shall be used for captive consumption.