Gold Terra Resource Corp. announced the 2021 Drill program was completed on December 18th, for a total of 26 holes and a grand total of 12,687 metres targeting the Campbell Shear over a strike length of 3 kilometres immediately south of the former Con Mine (1938-2003). Drilling was done between surface and approximately 400 metres below surface with excellent results on the Yellorex zone.

The Campbell shear target and gold mineralization were intersected in all the holes of the 2021 program illustrating the continuity of the structure and identifying typical gold zoning similar to the former Con Mine gold mineralization. Assays are pending for the last five holes, GTCM21-022 to 026. Drilling is expected to resume on/or close to January 10th, 2022, with one drill which can reach depths down to 1,500 metres, followed by a second drill around January 20th.

The Company intends to drill approximately 40,000 metres in 2022, subject to success and subsequent financing. The Company's cash position stands at CAD 2.6 million at the end of November.