Camber Energy, Inc. announced the successful conclusion of critical independent testing of its Broken Conductor Protection Technology for Electric Transmission Systems. The comprehensive testing, which included over fifty real-time-digital-simulations of broken conductors using varying voltage levels at different points of a transmission line, demonstrated the reliability and effectiveness of Camber's technology in de-energizing a broken conductor before it contacts the ground or a grounded structure, thereby preventing the conductor from being a source of ignition or a danger to life and property. This testing was coordinated by Bridge View Resources, LLC (BVR) and conducted at a laboratory of a nationally-recognized engineering firm that specializes in complex and diverse electrical transmission and distribution projects for investor-owned utilities, municipalities, rural cooperatives, and industrial clients.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
0.1175 USD | -2.57% |
|
+2.44% | -48.56% |
06-24 | Camber Energy, Inc. Announces Milestone Test Results for Wildfire Mitigation Technology | CI |
06-18 | Camber Energy, Inc. Announces Pilot Program with Western Canada's Large Telecom Provider | CI |
Chiffre d''affaires - Rate of surprise
1st Jan change | Capi. | |
---|---|---|
-48.56% | 21.2M | |
+4.87% | 288B | |
+72.31% | 137B | |
-1.46% | 133B | |
+12.27% | 76.21B | |
+4.07% | 71.58B | |
+5.56% | 55.58B | |
+2.33% | 45.31B | |
-9.18% | 35.64B | |
+29.09% | 35.52B |
- Stock Market
- Equities
- CEI Stock
- News Camber Energy, Inc.
- Camber Energy, Inc. Announces Milestone Test Results for Wildfire Mitigation Technology