The Board of Directors of Burwill Holdings Limited announce that following the first batch of 11,000 tonnes of lithium concentrate in 2019 shipped on 10 March 2019, the second batch of 10,700.49 tonnes of lithium concentrate was loaded on the MV LOVELAND ISLAND for China on 22 March 2019. The third batch of lithium concentrate is scheduled to be delivered in April 2019. The offtake rights to the Bald Hill lithium project in western Australia is owned by Jiangxi Bao Jiang Lithium Industrial Limited, which Burwill Lithium Company Limited (a wholly-owned subsidiary of the Company) holds 50% of shares of the joint venture.