Atlanta Gold Inc. announced that the completion of the installation of the Passive Filtration System at the Pilot Water Treatment Facility (PWTF) on-site at the Atlanta property in Elmore County, Idaho, testing of the filtration system has begun by the contracted engineering firm, CENTRA Consulting Inc. While initial testing has been quite positive, a 45-day period is required to fully test the system during which twice weekly water samples will be taken and sent for lab analysis. This should be completed by mid-December, at which time CENTRA will certify the efficacy of the system. The PWTF filtration plant utilizes a proprietary technology that is a relatively low cost, energy efficient, safe solution to water treatment issues common to many others in the State of Idaho.

The company will license a second party to make this system available to others that have similar arsenic issues.