Redstar Gold Continues to Intersect Wide Zones of Gold Mineralization with Multiple Zones of High-grade Gold at its Newman Todd Project, Red lake District, Ontario
Significant milestones in the project to date:
- Confirmed the existence of a large scale open ended, gold-bearing hydrothermal system (approximately 2.2km long and > 500 metres of depth extent)
- Confirmed the continuation of high-grade gold from the surface to a depth of 500 metres
- Identified key ore controls to high-grade gold mineralization within the NTS
- Established an all season exploration camp to continue year-round exploration
- Recognized the deposit type as being similar to the high grade zone at the Red Lake Mine
- NT-096 intersects 2.0 metres of 15.58 g/t gold including 1.0 metres of 29.80 g/t gold
- NT-097 intersects 59.0 metres of 1.04 g/t gold including 5.0 metres of 4.74 g/t gold and including 0.50 metres of 39.50 g/t gold
-
NT-102 intersects several zones including:
- 15.0 metres of 3.27 g/t gold including 1.0 metres of 36.15 g/t gold
- 47.0 metres of 2.17 g/t gold including 3.0 metres of 19.42 g/t gold and including 1.0 metres of 56.80 g/t gold
- 42.0 metres of 1.52 g/t gold including 1.0 metres of 17.10 g/t gold.
Discussion of Results:
Gold mineralization continues to be associated with veining and silica/sulphide replacement zones within the widespread iron-carbonate alteration system of the NTS. These zones continue to be intersected in drilling along the entire drilled strike length of the NTS
Surface Sampling program:
Recent geological and structural mapping has indentified a surface exposure of the NTS which was washed and sampled across gold bearing zones. The sampling occurred on a stripped outcrop towards the southwest portion of the property where 18 channels were cut for a total of 166.5 metres and 170 samples. The exposed area of the NTS is approximately 100 m by 30m wide. Channels were oriented parallel to and cross cutting the current drill direction in order to define the trend of mineralization. Several short sample intervals were also collected to characterize gold mineralization associated with visible gold in quartz veins, magnetite replacement zones , shear zones and sulphide replacement zones. Approximately 24% of the samples returned 0.50 g/t gold or higher with a high value of 0.5m of 40.3 g/t gold. A drill plan can be found on the company's web site, .
Scott Weekes, President of Redstar stated: "We are extremely pleased with results from the 2011 drill program, although in early stages of drilling, the data to date have shown incredible continuity of the gold mineralizing system along the entire drilled area. With the recent discovery of high-grade mineralization at surface and the depth of the current drilling, we are confident that the depth extent of the NTS far exceeds 1km and may in fact be several kilometres deep. Gold mineralization is thought to occur as individual near vertical to steeply plunging zones which can have incredible down-plunge continuity. Our geological team has proposed that there may be at least 20 individual high-grade zones within the wide spaced current drill area. This is very impressive when you compare it to the current Mineral Resource Estimate at the Red Lake Mine where 32 zones where used to determine the gold resource. Ore veins at the Red Lake Mine average 1.5 - 1.8 metres in width and extend over strike lengths between 30 to 300 metres. Sulphide replacement zones at the Red Lake Mine vary from 3-12 metres wide and extend between 120 - 180 metres in strike length. (Gold Corp NI 43-101 report dated January 15, 2011). If we superimpose the width and strike length of the Red Lake Mine zones over the NTS, we can easily fit several Red Lake Mine style high grade zones between our drill spacing."
Hole | From (m) | To (m) | Gold (g/t) | Width (m) | |||||||
NT-093 | 102.00 | 104.50 | 7.07 | 2.50 | |||||||
NT-093 | including | 102.00 | 102.50 | 9.14 | 0.50 | ||||||
NT-093 | and including | 104.00 | 104.50 | 25.80 | 0.50 | ||||||
NT-093 | and including | 144.00 | 157.00 | 0.79 | 13.00 | ||||||
NT-093 | including | 144.00 | 145.00 | 4.82 | 1.00 | ||||||
NT-093 | and including | 201.00 | 205.00 | 3.01 | 4.00 | ||||||
NT-093 | including | 203.00 | 204.00 | 11.10 | 1.00 | ||||||
NT-095 | 308.00 | 313.00 | 1.07 | 5.00 | |||||||
NT-095 | including | 308.00 | 309.00 | 3.56 | 1.00 | ||||||
NT-096 | 79.00 | 87.00 | 1.21 | 8.00 | |||||||
NT-096 | including | 80.00 | 82.00 | 4.03 | 2.00 | ||||||
NT-096 | and including | 239.00 | 244.00 | 1.01 | 5.00 | ||||||
NT-096 | including | 240.00 | 241.00 | 3.23 | 1.00 | ||||||
NT-096 | and | 251.00 | 252.00 | 3.15 | 1.00 | ||||||
NT-096 | and | 280.00 | 284.00 | 1.27 | 4.00 | ||||||
NT-096 | including | 282.00 | 282.50 | 7.89 | 0.50 | ||||||
NT-096 | and | 319.00 | 320.00 | 4.06 | 1.00 | ||||||
NT-096 | and | 443.00 | 445.00 | 15.58 | 2.00 | ||||||
NT-096 | including | 443.00 | 444.00 | 29.80 | 1.00 | ||||||
NT-097 | 274.00 | 303.00 | 1.11 | 29.00 | |||||||
NT-097 | including | 275.00 | 287.00 | 2.09 | 12.00 | ||||||
NT-097 | and including | 275.00 | 277.00 | 3.87 | 2.00 | ||||||
NT-097 | and including | 281.00 | 282.00 | 6.49 | 1.00 | ||||||
NT-097 | and including | 285.00 | 287.00 | 4.19 | 2.00 | ||||||
NT-097 | and | 375.00 | 379.00 | 1.66 | 4.00 | ||||||
NT-097 | including | 376.00 | 377.00 | 4.93 | 1.00 | ||||||
NT-097 | and | 392.00 | 392.50 | 3.92 | 0.50 | ||||||
NT-097 | and | 417.00 | 419.00 | 3.98 | 2.00 | ||||||
NT-097 | including | 418.50 | 419.00 | 12.10 | 0.50 | ||||||
NT-097 | and | 485.00 | 544.00 | 1.04 | 59.00 | ||||||
NT-097 | including | 488.00 | 490.00 | 7.73 | 2.00 | ||||||
NT-097 | and including | 489.00 | 490.00 | 13.20 | 1.00 | ||||||
NT-097 | and including | 501.00 | 506.00 | 4.74 | 5.00 | ||||||
NT-097 | and including | 502.00 | 502.50 | 39.50 | 0.50 | ||||||
NT-097 | and including | 531.00 | 531.50 | 10.60 | 0.50 | ||||||
NT-098 | 403.00 | 421.00 | 1.75 | 18.00 | |||||||
NT-098 | including | 404.00 | 405.00 | 21.00 | 1.00 | ||||||
NT-098 | and including | 415.00 | 416.00 | 4.64 | 1.00 | ||||||
NT-098 | and | 458.00 | 459.00 | 3.26 | 1.00 | ||||||
NT-099 | including | 439.50 | 441.80 | 3.78 | 2.30 | ||||||
NT-099 | and including | 439.50 | 440.00 | 7.57 | 0.50 | ||||||
NT-099 | and including | 440.50 | 441.00 | 8.04 | 0.50 | ||||||
NT-100 | 195.00 | 196.00 | 3.79 | 1.00 | |||||||
NT-100 | including | 192.00 | 203.00 | 1.03 | 11.00 | ||||||
NT-100 | and including | 199.00 | 203.00 | 1.42 | 4.00 | ||||||
NT-100 | and including | 200.00 | 201.00 | 3.72 | 1.00 | ||||||
NT-101 | 507.00 | 514.50 | 1.35 | 7.50 | |||||||
NT-101 | including | 513.00 | 513.50 | 11.70 | 0.50 | ||||||
NT-101 | and | 535.00 | 536.00 | 7.42 | 1.00 | ||||||
NT-102 | 191.00 | 196.00 | 2.97 | 5.00 | |||||||
NT-102 | including | 191.00 | 192.00 | 11.70 | 1.00 | ||||||
NT-102 | and | 255.00 | 270.00 | 3.27 | 15.00 | ||||||
NT-102 | including | 255.00 | 256.00 | 36.15 | 1.00 | ||||||
NT-102 | and including | 255.00 | 255.50 | 42.80 | 0.50 | ||||||
NT-102 | and including | 268.00 | 270.00 | 5.23 | 2.00 | ||||||
NT-102 | and | 296.00 | 343.00 | 2.17 | 47.00 | ||||||
NT-102 | including | 300.00 | 303.00 | 19.42 | 3.00 | ||||||
NT-102 | and including | 301.00 | 302.00 | 56.80 | 1.00 | ||||||
NT-102 | and including | 311.00 | 311.50 | 37.80 | 0.50 | ||||||
NT-102 | and including | 336.00 | 338.00 | 3.02 | 2.00 | ||||||
NT-102 | and | 380.00 | 422.00 | 1.52 | 42.00 | ||||||
NT-102 | including | 408.00 | 414.00 | 0.04 | 6.00 | ||||||
NT-102 | and including | 387.00 | 401.00 | 3.02 | 14.00 | ||||||
NT-102 | and including | 393.00 | 394.00 | 6.24 | 1.00 | ||||||
NT-102 | and including | 400.00 | 401.00 | 17.10 | 1.00 | ||||||
NT-102 | and including | 420.00 | 421.00 | 9.57 | 1.00 |
* Width is calculated as core length and does not imply true width of the zone. Weighted average gold intervals apply a 0.25 g/t lower cut-off. Internal dilution within reported intervals does not exceed core lengths of four metres unless otherwise indicated.
** Cross sections are spaced 25 metres apart across the entire NTS, Section 1375 marks the centre of the Heath Bull Zone. NT-094 was drilled outside of the NTS and intersected weakly anomalous gold values.
Exploration work at the Newman Todd project is funded by Confederation Minerals Ltd. (Confederation) (TSX.V:CFM). Confederation can earn a 50% interest in the project by spending $5.0 million in exploration by November 2013, and an additional 20% by producing a Preliminary Economic Assessment (PEA) by November 2016. During the earn-in period, Confederation is the operator of the project.
Core samples from the program were cut in half, using a diamond cutting saw, and were sent to Activation Laboratories Ltd. in Red Lake, Ontario, an accredited mineral analysis laboratory, for analysis. All samples were analyzed for gold using standard Fire Assay-AA techniques. Samples returning over 3.0 g/t gold were analyzed utilizing standard Fire Assay-Gravimetric methods. Certified gold reference standards, blanks and field duplicates were routinely inserted into the sample stream, as part of Confederation's quality control/quality assurance program.
Bob Singh P.Geo is the qualified person as defined by National Instrument 43-101 and has reviewed this news release. Mr. Singh has been engaged through a third party service provider by Confederation Minerals Ltd. to manage the project, and is also the Canadian Exploration Manager for Redstar Gold Corp.
On Behalf of the Board,
Redstar Gold Corp
"Scott Weekes"
Scott Weekes
President
SUITE 615
800 WEST PENDER STREET
VANCOUVER, BC
TEL: 604.488.0051
CORPORATE INQUIRIES
Redstar Gold Corp.
Tim Mikula, Business Development
Tel: 604.488.0051
tmikula@redstargold.com
Forward-Looking Information This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Redstar Gold Corporation (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
distribué par | Ce noodl a été diffusé par Redstar Gold Corp. et initialement mise en ligne sur le site http://www.redstargold.com. La version originale est disponible ici. Ce noodl a été distribué par noodls dans son format d'origine et sans modification sur 2012-01-12 16:07:54 PM et restera accessible depuis ce lien permanent. Cette annonce est protégée par les règles du droit d'auteur et toute autre loi applicable, et son propriétaire est seul responsable de sa véracité et de son originalité. |