Objective

The objective of the audit was to assess whether Statoil is planning Johan Castberg FPSO in compliance with the requirements in HSE regulations for the petroleum activities and balancing different safety and working environment concerns. A further objective was to obtain information and assessments from Statoil for use in our processing of the application for approval of the plan for development and operation (PDO) for Johan Castberg.

Result
No non-conformities were identified.

One improvement point was identified linked to assessment of and technical solutions for the removal of snow and ice.

Background

Johan Castberg will be the northernmost facility on the Norwegian Continental Shelf and must be designed to operate safely in the intended location. During the project period, costs have been considerably reduced. The Petroleum Safety Authority Norway has been concerned that the cost reductions do not reduce the unit's robustness in respect of OHAS. Robustness in the petroleum activities has been a particular focus of the PSA's main theme for 2017, under the heading 'Reversing the trend'. (www.trendenskalsnus.no).

Statoil submitted an application for approval of the plan for development and operation (PDO) for Johan Castberg on 12 December 2017

Petroleum Safety Authority Norway published this content on 18 January 2018 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 18 January 2018 13:39:04 UTC.

Original documenthttp://www.ptil.no/audit-reports/audit-of-statoil-design-of-johan-castberg-fpso-article13376-889.html

Public permalinkhttp://www.publicnow.com/view/DA8EBE48875605CB0223CC303DED3C257E57E277