Furthermore, since high gas reading is still shown at the bottom sands prior TD and the 3D seismic PSDM interpretation indicates deeper sands have hydrocarbon potential, to maximize the project's value it was decided to deepen the well with strictly controlled Drilling parameters to mitigate drilling risks. The well has been secured with 7" liner and drilling the deepening section is in progress. The DST program has been prepared to test the Anambas-2X well.
Under the supervision of Indonesia Arae office team headed by Abdulaziz al-Mousawi and The guidance of KUFPEC Exploration Department team managed by Khaled Al-Mulla, KUFPEC Indonesia AO is striving to fulfill its exploration commitment in the block safely and under budget.
"The Anambas-2X well drilling has shown KUFPEC capabilities as a prudent operator in preparation and execution of an offshore exploration well in a safe manner and we look forward for a successful well testing operation" said Abdulaziz Al-Mousawi, Indonesia Country Manager, during a Rig visit accompanied by Naser Al-Houti Indonesia Operation Manager and Muhammad Farhan Indonesia Subsurface Manager. The Indonesia Area Office management appraise the successful and efficiency of drilling achievements and encourage the team to keep up with the good work.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
KUFPEC - Kuwait Foreign Petroleum Exploration Company published this content on 09 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 10 January 2022 08:47:01 UTC.