Novo Resources Corp. announced that it has recently strengthened its high-quality, Australian based exploration portfolio by adding the TechGen John Bull Gold Project in the New England Orogen of NSW, and Manhattan Tibooburra Gold Project in the Albert Goldfields in northwestern NSW. Both projects demonstrate prospectivity for significant discovery and resource definition and align with Novo's strategy of identifying and exploring projects with > 1 Moz Au potential.

Geobank is a Documentation of primary data, data entry front-end UX/UI tender software platform (developed procedures, data verification, data storage and sold by Micromine) attached to a SQL v15.1 (physical and electronic) protocols. server. Data spacing is varied but the drill holes reported are along three/four separate drill lines with spacings between holes of 30 m - 60 m. Data density is appropriately indicated in the on driII hole location plans and cross section images.

No Resource or Ore Reserve estimates are presented.rientation of data in relation to geological structure: Whether the orientation of sampling achieves; Novo Resources 2025 Rock Chips - Rock chip unbiased sampling of possible structures and the sampling across potentially mineralised structures and the sampling across potentially Mineralised structures is considered to have introduced a Novo Resources 2025 Soil Samples - Soil sampling bias, this should be assessed and reported sampling extends and infills the original TechGen if material. programs, so logistics dictate the same grid orientation. relationship between mineralisation widths and intercept lengths: These relationships are particularly Drilling is perpendicular to the mineralised vein important in the reporting of Exploration orientation and oblique to stratigraphy.

Drill hole Results. dip angles at 60 degrees provide intercepts that are close to true width (estimated 80 to 90%) If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. These data support the documented geophysical survey results; geochemical survey understanding of the project but cannot be suitably results; bulk samples - size and method of validated for inclusion.

treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminants substances. Novo intends to (e.g., tests for lateral extensions or depth complete a 1,500 m RC drilling program, focused on extensions or large-scale deposits.